[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953637":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953637,691,1,"单选题","主要在项目实施准备阶段进行，并延伸到项目实施阶段和投产竣工阶段的工作是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工方项目管理",false,{"key":16,"text":17,"correct":14},"B","供货方项目管理",{"key":19,"text":20,"correct":21},"C","设计方项目管理",true,{"key":23,"text":24,"correct":14},"D","总承包方项目管理","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]