[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953636":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953636,691,1,"单选题","在工程施工阶段，项目投资控制的主要任务是以( )等为控制依据，通过工程计量、工程变更控制等方法，按照承包方实际完成的工程量，严格确定施工阶段实际发生的工程费用。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","投资估算、工程施工承包合同价",false,{"key":16,"text":17,"correct":14},"B","施工图预算、投资估算",{"key":19,"text":20,"correct":21},"C","施工图预算、工程施工承包合同价",true,{"key":23,"text":24,"correct":14},"D","投资估算、设计概算","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]