[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953635":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953635,691,1,"单选题","采取落实加快工程施工进度所需的资金等措施属于目标控制纠偏措施中的( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术措施",false,{"key":16,"text":17,"correct":14},"B","管理措施",{"key":19,"text":20,"correct":14},"C","组织措施",{"key":22,"text":23,"correct":24},"D","经济措施",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]