[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953624":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953624,691,1,"单选题","在实际工作中，通常以质量目标为中心，如果投资目标和进度目标与质量目标发生矛盾时，应服从质量目标，特别是对保证项目使用和安全有影响的技术要求，应保证( )满足。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","达到90%以上",false,{"key":16,"text":17,"correct":14},"B","达到95%以上",{"key":19,"text":20,"correct":14},"C","达到98%以上",{"key":22,"text":23,"correct":24},"D","100%",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]