[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953621":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953621,691,1,"单选题","可能从项目实施准备阶段开始，一直延伸到项目实施阶段和投产竣工阶段的工作是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","供货方的项目管理",true,{"key":16,"text":17,"correct":18},"B","设计方的项目管理",false,{"key":20,"text":21,"correct":18},"C","施工方的项目管理",{"key":23,"text":24,"correct":18},"D","业主方的项目管理","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]