[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953614":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953614,691,1,"单选题","工程施工阶段投资控制的目标值是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工图预算或投资估算",false,{"key":16,"text":17,"correct":14},"B","设计概算或建设项目的投资估算",{"key":19,"text":20,"correct":14},"C","施工图预算或设计概算",{"key":22,"text":23,"correct":24},"D","施工图预算或工程承包合同价格",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]