[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953603":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},953603,691,1,"单选题","主要在项目实施阶段和投产竣工阶段进行的工作是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计方的项目管理",false,{"key":16,"text":17,"correct":18},"B","施工方的项目管理",true,{"key":20,"text":21,"correct":14},"C","供货方的项目管理、",{"key":23,"text":24,"correct":14},"D","业主方的项目管理","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]