[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953596":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953596,691,1,"单选题","建设产品的( )的特点，决定了建设项目的价值工程活动具有高效性，节约的潜力大，开展价值工程活动的效益高。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","多样性",false,{"key":16,"text":17,"correct":14},"B","使用寿命长",{"key":19,"text":20,"correct":14},"C","建设周期长",{"key":22,"text":23,"correct":24},"D","投资巨大、价值高昂",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]