[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953594":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953594,691,1,"单选题","采取调整进度管理的方法和手段，改变施工管理和强化合同管理等措施属于目标控制纠偏措施中的( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","管理措施",true,{"key":16,"text":17,"correct":18},"B","组织措施",false,{"key":20,"text":21,"correct":18},"C","技术措施",{"key":23,"text":24,"correct":18},"D","经济措施","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]