[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953589":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953589,691,1,"单选题","在技术设计和施工图设计阶段，建设项目投资的控制目标是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程承包合同价格",false,{"key":16,"text":17,"correct":14},"B","施工图预算",{"key":19,"text":20,"correct":21},"C","设计概算",true,{"key":23,"text":24,"correct":14},"D","建设项目的投资估算","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]