[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953588":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953588,691,1,"单选题","在项目总承包模式或CM模式条件下，因为( )介入设计或影响设计，其参与项目实施的时间范围不仅仅局限于施工阶段。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包商",true,{"key":16,"text":17,"correct":18},"B","建设单位",false,{"key":20,"text":21,"correct":18},"C","监理单位",{"key":23,"text":24,"correct":18},"D","设计单位","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]