[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953585":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953585,691,1,"单选题","建设项目周期长，生产工艺复杂，建筑材料种类多，建筑技术发展迅速，影响建设项目因素多种多样，工程建设阶段性强并且相互穿插，由此导致了建设项目文档资料的( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","继承性和时效性",false,{"key":16,"text":17,"correct":14},"B","随机性",{"key":19,"text":20,"correct":14},"C","多专业性和综合性",{"key":22,"text":23,"correct":24},"D","分散性和复杂性",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]