[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953543":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953543,691,1,"单选题","一般情况下，( )施工总承包管理单位不参与具体工程的施工，而具体工程施工需要再进行分包的招标与发包，把具体施工任务分包给分包商来完成。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工总承包",true,{"key":16,"text":17,"correct":18},"B","平行发包",false,{"key":20,"text":21,"correct":18},"C","施工合作体承包",{"key":23,"text":24,"correct":18},"D","设计总负责","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]