[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953495":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953495,691,1,"单选题","物质流程组织的内容不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","弱电工程物资采购工作流程",false,{"key":16,"text":17,"correct":14},"B","钢结构深化设计工作流程",{"key":19,"text":20,"correct":14},"C","外立面施工工作流程",{"key":22,"text":23,"correct":24},"D","与生成月度进度报告有关的数据处理流程",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]