[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953491":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953491,691,1,"单选题","下列结构图中，( )对一个项目的结构进行逐层分解，以反映组成该项目的所有工作任务。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","管理结构图",false,{"key":16,"text":17,"correct":14},"B","合同结构图",{"key":19,"text":20,"correct":21},"C","项目结构图",true,{"key":23,"text":24,"correct":14},"D","组织结构图","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目组织","建筑工程",0]