[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-690-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":499},{"id":5,"name":6,"category":7,"favorite":8},690,"投资建设项目实施","建筑工程",0,9,50,433,[13,38,53,67,82,97,111,126,140,154,169,183,196,210,225,240,255,270,284,298,312,327,341,355,370,384,399,413,428,443,457,471,485],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},953449,2,"多选题","承包商向建设项目业主提出交工验收申请时，应具备的条件有( )。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","设备已进行试车调试",true,{"key":24,"text":25,"correct":22},"B","竣工资料文件已备好",{"key":27,"text":28,"correct":22},"C","合同规定内容已完成",{"key":30,"text":31,"correct":32},"D","已将相关资料移交项目业主",false,{"key":34,"text":35,"correct":22},"E","已进行自检","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},953450,"工程文档资料的来源主要有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"国际、国内与建设项目有关的各种社会、经济信息",{"key":24,"text":45,"correct":22},"对项目建设有直接或间接影响的法律、法规以及有关政策文件",{"key":27,"text":47,"correct":22},"项目建设全过程中直接形成的文件资料",{"key":30,"text":49,"correct":22},"各种媒体发表的与建设项目有关的评论和文章",{"key":34,"text":51,"correct":32},"建设工程合同","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},953451,"建设单位在竣工验收中的任务主要包括( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"及时受理和审查承包商提出的单项工程交工验收申请",{"key":24,"text":60,"correct":22},"组织工程设计、工程监理等单位，做好每一项验收工作",{"key":27,"text":62,"correct":22},"及时做好全面竣工验收的各项准备",{"key":30,"text":64,"correct":22},"向有关验收主管部门提出全面竣工验收申请，并负责做好竣工验收组织工作",{"key":34,"text":66,"correct":32},"协调建设项目各参与方的计划安排",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},953452,"全面竣工验收分为( )等步骤。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"验收准备",{"key":24,"text":74,"correct":22},"预验收",{"key":27,"text":76,"correct":22},"正式验收",{"key":30,"text":78,"correct":32},"档案移交",{"key":34,"text":80,"correct":32},"办理资产移交手续","ABC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},953453,"为达到工程文档管理的目的与要求，确保工程文档的收集、整理、归档工作与项目的立项、准备、建设实施以及竣工验收同步进行，项目业主应当( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"明确档案管理分工",{"key":24,"text":89,"correct":32},"审议竣工验收报告",{"key":27,"text":91,"correct":22},"建立档案管理体系",{"key":30,"text":93,"correct":22},"统一档案整理标准",{"key":34,"text":95,"correct":22},"设立档案管理机构","ACDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":96,"analysis":37},953454,"下列关于建设项目全面竣工验收的表述，正确的是( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"多数工业项目须在交付使用一段时间以后才进行全面竣工验收",{"key":24,"text":104,"correct":32},"全面竣工验收是单项竣工验收的基础",{"key":27,"text":106,"correct":22},"全面竣工验收应按谁投资、谁决策、谁验收的原则确定验收主体",{"key":30,"text":108,"correct":22},"对于大型或特大型项目，一般应组成竣工验收委员会进行验收",{"key":34,"text":110,"correct":22},"项目竣工验收委员会或验收组由项目业主负责组织",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},953455,"为使全面竣工验收工作顺利进行，项目业主事先应做好的准备工作有( )。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"核实建安工程，抓紧工程收尾",{"key":24,"text":118,"correct":32},"筹组竣工验收委员会",{"key":27,"text":120,"correct":32},"提出正式验收申请报告",{"key":30,"text":122,"correct":22},"编制竣工决算，提出财务决算分析",{"key":34,"text":124,"correct":22},"复查工程质量，限定修复时间","ADE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":52,"analysis":37},953456,"项目建设全过程一般分为( )等阶段。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"立项决策",{"key":24,"text":133,"correct":22},"实施准备",{"key":27,"text":135,"correct":22},"建设实施",{"key":30,"text":137,"correct":22},"竣工投产",{"key":34,"text":139,"correct":32},"保修",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":52,"analysis":37},953457,"建设项目绩效和影响评价一般分为( )等方面。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"财务和经济效益",{"key":24,"text":147,"correct":22},"环境影响",{"key":27,"text":149,"correct":22},"技术效果",{"key":30,"text":151,"correct":22},"社会影响",{"key":34,"text":153,"correct":32},"合同执行与管理",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},953458,"企业或行业内有代表性的项目是指( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"大型企业内经营主业有代表性的项目",{"key":24,"text":161,"correct":32},"跨地区、跨流域、跨行业的项目",{"key":27,"text":163,"correct":22},"属于新技术、新能源以及新兴产业发展有代表性的项目",{"key":30,"text":165,"correct":22},"行业内具有示范意义的典型项目",{"key":34,"text":167,"correct":32},"对提升企业核心竞争力有较大影响的项目","ACD",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":52,"analysis":37},953459,"建设项目后评价的主要方法有( )等。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"调查法",{"key":24,"text":176,"correct":22},"对比法",{"key":27,"text":178,"correct":22},"逻辑框架法",{"key":30,"text":180,"correct":22},"层次分析法",{"key":34,"text":182,"correct":32},"分析复核法",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":52,"analysis":37},953460,"项目后评价需要依据的资料文件有( )。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"政府部门或相关行业的后评价管理文件",{"key":24,"text":190,"correct":22},"项目前期文件",{"key":27,"text":192,"correct":22},"项目实施文件",{"key":30,"text":194,"correct":22},"项目自我总结评价报告",{"key":34,"text":49,"correct":32},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":52,"analysis":37},953461,"项目后评价的评价指标主要包括( )。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"工程技术评价指标",{"key":24,"text":203,"correct":22},"财务和经济评价指标",{"key":27,"text":205,"correct":22},"项目生态与环境评价主要指标",{"key":30,"text":207,"correct":22},"管理效能评价指标",{"key":34,"text":209,"correct":32},"项目绩效与影响评价指标",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":37},953462,"实施准备阶段的回顾与评价的重点是( )。",[214,216,218,220,222],{"key":20,"text":215,"correct":32},"评价项目前期工作的质量与合规性",{"key":24,"text":217,"correct":32},"实施过程中产生的主要变化、原因及其影响",{"key":27,"text":219,"correct":22},"各项准备工作是否充分",{"key":30,"text":221,"correct":32},"评价项目业主的组织能力与管理水平",{"key":34,"text":223,"correct":22},"开工前的各项报批手续是否齐全","CE",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},953463,"建设项目后评价的原则主要包括( )。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"客观求是原则",{"key":24,"text":232,"correct":32},"优质优价原则",{"key":27,"text":234,"correct":22},"第三方独立评价原则",{"key":30,"text":236,"correct":32},"公开原则",{"key":34,"text":238,"correct":22},"科学可靠原则","ACE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},953464,"分析评价建设项目的目标实现程度是后评价的重要任务之一，评价时可从( )等方面进行分析。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"项目工程是否建成",{"key":24,"text":247,"correct":22},"项目技术是否建成",{"key":27,"text":249,"correct":32},"项目目标是否建成",{"key":30,"text":251,"correct":22},"项目经济是否建成",{"key":34,"text":253,"correct":22},"项目影响是否建成","ABDE",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},953465,"社会影响评价主要是分析项目建设对当地经济和社会发展的影响，包含( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"征地拆迁补偿和移民安置情况",{"key":24,"text":262,"correct":22},"对当地增加就业机会的影响",{"key":27,"text":264,"correct":32},"项目对自然资源的保护与利用情况",{"key":30,"text":266,"correct":32},"财务效益评价",{"key":34,"text":268,"correct":22},"对当地税收与收入分配的影响","ABE",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":36,"analysis":37},953466,"项目可持续性分析要素包括内部因素持续能力及内部因素持续能力两方面，其中，内部因素持续能力主要包括( )。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"物流条件",{"key":24,"text":277,"correct":22},"政策环境",{"key":27,"text":279,"correct":22},"资源储量",{"key":30,"text":281,"correct":32},"人力资源状况",{"key":34,"text":283,"correct":22},"市场变化及其趋势",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":96,"analysis":37},953467,"建设项目管理是运用科学的理念、程序和方法，采用先进的管理技术和现代化管理手段，对投资建设项目进行( )的一系列活动。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"计划",{"key":24,"text":291,"correct":32},"检查",{"key":27,"text":293,"correct":22},"组织",{"key":30,"text":295,"correct":22},"协调",{"key":34,"text":297,"correct":22},"控制",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":52,"analysis":37},953468,"在项目建设实施管理目标体系中，最重要的是( )控制目标。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"质量",{"key":24,"text":305,"correct":22},"工期",{"key":27,"text":307,"correct":22},"费用",{"key":30,"text":309,"correct":22},"安全生产",{"key":34,"text":311,"correct":32},"信息管理",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":326,"analysis":37},953469,"建设项目管理团队的主要职责包括( )。",[316,318,320,322,324],{"key":20,"text":317,"correct":32},"项目建设系统性管理",{"key":24,"text":319,"correct":22},"项目建设全过程管理",{"key":27,"text":321,"correct":22},"项目建设专项管理",{"key":30,"text":323,"correct":22},"项目建设合法性管理",{"key":34,"text":325,"correct":22},"项目生产准备与运营管理","BCDE",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":96,"analysis":37},953470,"推行\"代建制\"的关键是选择( )的代建单位。",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"有资质",{"key":24,"text":334,"correct":32},"规模大",{"key":27,"text":336,"correct":22},"信用好",{"key":30,"text":338,"correct":22},"有能力",{"key":34,"text":340,"correct":22},"有经验",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":52,"analysis":37},953471,"建设单位工程设计管理的重点是( )。",[345,347,349,351,353],{"key":20,"text":346,"correct":22},"编制工程设计任务书，明确建设单位对工程设计的任务和要求",{"key":24,"text":348,"correct":22},"组织招标，选择有资质、有信誉、有能力、业绩好的工程设计单位承担工程设计任务",{"key":27,"text":350,"correct":22},"按合同约定的工程设计进度和图纸交付进度要求进行监督检查",{"key":30,"text":352,"correct":22},"组织工程设计审查",{"key":34,"text":354,"correct":32},"熟悉设计文件及其图纸，组织施工图会审与设计交底",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":369,"analysis":37},953472,"项目建设目标由总体目标和分项目标组成一个完整的目标体系，目标控制必须是( )。",[359,361,363,365,367],{"key":20,"text":360,"correct":32},"动态的",{"key":24,"text":362,"correct":32},"确定的",{"key":27,"text":364,"correct":22},"系统的",{"key":30,"text":366,"correct":22},"连续的",{"key":34,"text":368,"correct":32},"独立的","CD",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":254,"analysis":37},953473,"按有关规定，建设项目业主应当办理申请批准手续的情况包括( )。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"需要临时占用规划批准范围以外场地的",{"key":24,"text":377,"correct":22},"可能损坏道路、管线、电力、邮电通信等公共设施的",{"key":27,"text":379,"correct":32},"需要进行改建、拆除作业的",{"key":30,"text":381,"correct":22},"需要临时停水、停电、中断道路交通的",{"key":34,"text":383,"correct":22},"需要进行爆破作业的",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":398,"analysis":37},953474,"采用分项委托管理模式的作用是( )。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"有利于发挥市场机制",{"key":24,"text":391,"correct":32},"有利于充分发挥专业管理机构的能力和经验",{"key":27,"text":393,"correct":32},"有利于提高项目管理水平",{"key":30,"text":395,"correct":32},"有利于对项目建设活动进行全面管理",{"key":34,"text":397,"correct":22},"有利于各参与方之间的权、责、利的相互制衡，提高投资效益","AE",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":326,"analysis":37},953475,"关于建设用地管理规定的表述，正确的是( )。",[403,405,407,409,411],{"key":20,"text":404,"correct":32},"建设项目在办理备案后，建设单位应将批准文件向省人民政府国土资源管理部门提出建设用地申请",{"key":24,"text":406,"correct":22},"建设项目应缴纳新增建设用地有偿使用费",{"key":27,"text":408,"correct":22},"建设用地实行预审管理",{"key":30,"text":410,"correct":22},"需要核准的建设项目，在建设项目申请报告核准前，由建设单位提出建设用地预审申请报告",{"key":34,"text":412,"correct":22},"建设用地分为单独选址用地和城市批次建设用地",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":427,"analysis":37},953476,"关于工程施工阶段的环境保护管理的表述中，正确的是( )。",[417,419,421,423,425],{"key":20,"text":418,"correct":32},"建设单位负责落实环境保护部门对施工阶段的环保要求和施工过程中的环保措施",{"key":24,"text":420,"correct":22},"建设项目完工后，施工单位应当修整和恢复在建设过程中受到破坏的环境",{"key":27,"text":422,"correct":22},"施工过程中，建设单位与施工单位负责保护施工现场周围的环境，防止对自然环境造成不应有的破坏",{"key":30,"text":424,"correct":32},"建设单位在设计会审前，应向政府环境保护行政主管部门报送设计文件",{"key":34,"text":426,"correct":32},"建设单位应按\"三同时\"要求，对主体工程和环保工程同时投入试运行","BC",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":442,"analysis":37},953477,"建设项目建造阶段的主要任务是( )。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"按工程建设计划和工程承包合同，组织工程施工",{"key":24,"text":435,"correct":22},"实行有效的管理和控制，完成项目建设任务",{"key":27,"text":437,"correct":32},"开展融资活动，落实建设资金",{"key":30,"text":439,"correct":22},"按相关规定组织项目竣工验收，将资产交付使用",{"key":34,"text":441,"correct":32},"落实水、电、气等工程施工条件","ABD",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":52,"analysis":37},953478,"建设工程勘察、设计、施工的质量必须符合国家有关建设工程安全标准的要求，并实行的制度包括( )。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"工程质量管理分工负责制",{"key":24,"text":450,"correct":22},"工程质量监督制度",{"key":27,"text":452,"correct":22},"工程质量终身责任制度",{"key":30,"text":454,"correct":22},"工程质量检测制度",{"key":34,"text":456,"correct":32},"工程质量审查制",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":254,"analysis":37},953479,"建设项目环境保护管理的基本原则包括( )。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"防止建设项目产生新的污染，破坏生态环境",{"key":24,"text":464,"correct":22},"建设项目应采用能耗物耗少，污染物产生量少的清洁生产工艺，合理利用资源，防止环境污染和生态破坏",{"key":27,"text":466,"correct":32},"实行预防为主、防治结合、重点治理的原则",{"key":30,"text":468,"correct":22},"必须执行环境影响报告审批制度和环境保护\"三同时\"制度",{"key":34,"text":470,"correct":22},"改建、扩建和技术改选项目，必须采取措施，治理原有环境污染和生态破坏",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":239,"analysis":37},953480,"建设项目按建设性质可分为( )。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"新建项目",{"key":24,"text":478,"correct":32},"政府投资项目",{"key":27,"text":480,"correct":22},"扩建项目",{"key":30,"text":482,"correct":32},"企业投资项目",{"key":34,"text":484,"correct":22},"改建项目",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":168,"analysis":37},953481,"工程项目的外供条件涉及的范围较广，主要有( )。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"动力供给",{"key":24,"text":492,"correct":32},"劳动力配置条件",{"key":27,"text":494,"correct":22},"给排放条件",{"key":30,"text":496,"correct":22},"智能办公条件",{"key":34,"text":498,"correct":32},"工程材料供给与运输条件",[500,504,507,510,513,516],{"id":501,"name":502,"category":7,"favorite":503},1,"领导干部任职前廉政法规知识测试题",92,{"id":505,"name":506,"category":7,"favorite":501},595,"建筑结构与设备",{"id":508,"name":509,"category":7,"favorite":501},715,"招标采购专业知识与法律法规",{"id":511,"name":512,"category":7,"favorite":501},848,"市政方向-通用基础",{"id":514,"name":515,"category":7,"favorite":8},534,"BIM工程师",{"id":517,"name":515,"category":7,"favorite":8},535]