[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-690-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},690,"投资建设项目实施","建筑工程",0,8,50,433,[13,38,53,67,82,97,112,127,141,155,170,185,199,214,228,242,257,272,286,300,314,328,342,356,371,385,399,413,427,441,456,470,484,498,513,527,541,556,570,584,598,612,626,640,654,668,682,696,710,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},953399,2,"多选题","下列关于施工阶段工程质量控制原则的表述，正确的是( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","对建设项目工程施工全过程实施质量控制，并以事后控制为重点",false,{"key":24,"text":25,"correct":26},"B","严格要求承包单位执行有关材料试验制度和设备检验制度",true,{"key":28,"text":29,"correct":26},"C","对工程项目的人、机、料、方法、环境等因素进行全面的质量控制，监督承包单位的质量保证体系落实到位",{"key":31,"text":32,"correct":26},"D","以工程设计、施工及验收规范、工程质量验评标准等为依据，督促工程承包单位全面实现承包合同约定的质量目标",{"key":34,"text":35,"correct":26},"E","坚持不合格的建筑材料、构配件和设备不准在工程上使用","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},953400,"施工准备阶段的监理工作主要包括( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"参加由建设项目业主组织的工程设计交底会",{"key":24,"text":45,"correct":26},"审查施工组织设计，总监理工程师签认后报建设项目业主",{"key":28,"text":47,"correct":22},"对承包单位修复的工程质量进行验收，合格后予以签认",{"key":31,"text":49,"correct":22},"对工程质量缺陷原因进行调查分析，确定责任归属",{"key":34,"text":51,"correct":26},"审查工程分包单位资质、业绩及特殊工种的合格证、上岗证","ABE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},953401,"总监理工程师可签发工程暂停令的情形有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工单位要求暂停施工、且工程需要暂停施工",{"key":24,"text":60,"correct":26},"为了保证工程质量而需要进行停工处理.",{"key":28,"text":62,"correct":26},"施工出现了安全隐患，总监理工程师认为有必要停工以消除隐患",{"key":31,"text":64,"correct":26},"承包单位未经许可擅自施工，或拒绝项目监理机构管理",{"key":34,"text":66,"correct":26},"发生了必须暂时停止施工的紧急事件",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},953402,"工程复杂程度等级分为( )。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"简单",{"key":24,"text":74,"correct":26},"一般",{"key":28,"text":76,"correct":26},"复杂",{"key":31,"text":78,"correct":26},"较复杂",{"key":34,"text":80,"correct":22},"特别复杂","BCD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},953403,"工程监理单位安全控制的主要工作是( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"审查施工组织设计和施工方案、施工技术措施时，同时审查施工安全措施",{"key":24,"text":89,"correct":26},"监理过程中发现安全隐患应及时指出、限期解决，对违章操作应立即制止",{"key":28,"text":91,"correct":22},"总监理工程师审批承包单位报送的施工总计划进度",{"key":31,"text":93,"correct":26},"检查施工单位的安全生产责任制度、安全生产管理制度和相应的组织保证",{"key":34,"text":95,"correct":22},"监理工程师对进度计划实施情况进行检查分析","ABD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},953404,"总监理工程师签发的工程变更单应符合监理规范规定的格式，应包括( )等内容。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"工程变更要求",{"key":24,"text":104,"correct":22},"工程变更范围",{"key":28,"text":106,"correct":26},"工程变更说明",{"key":31,"text":108,"correct":26},"工程变更费用",{"key":34,"text":110,"correct":26},"工程变更工期","ACDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},953405,"保修阶段的监理应依据委托监理合同所约定的监理工作的( )开展工作。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"时间",{"key":24,"text":119,"correct":26},"范围",{"key":28,"text":121,"correct":26},"内容",{"key":31,"text":123,"correct":22},"性质",{"key":34,"text":125,"correct":22},"需要","ABC",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":126,"analysis":37},953406,"项目监理机构在审查工程延期时，应依( )确定批准工程延期的时间。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"施工合同中有关工程延期的约定",{"key":24,"text":134,"correct":26},"工期拖延和影响工期事件的事实和程度",{"key":28,"text":136,"correct":26},"影响工期事件对工期影响的量化程度",{"key":31,"text":138,"correct":22},"相关的法律、行政法规",{"key":34,"text":140,"correct":22},"工程建设的实际情况",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":111,"analysis":37},953407,"当承包单位提出费用索赔的理由同时满足( )时，项目监理机构应予以受理。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"索赔事件造成了承包单位直接经济损失",{"key":24,"text":148,"correct":22},"索赔事件造成的经济损失巨大",{"key":28,"text":150,"correct":26},"索赔事件是由于非承包单位的责任发生的",{"key":31,"text":152,"correct":26},"承包单位已按照施工合同规定的期限和程序提出费用索赔申请表",{"key":34,"text":154,"correct":26},"承包单位提出费用索赔申请表，附有索赔凭证材料",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},953408,"对于工程变更，总监理工程师应按照施工合同的有关条款，在指定专业监理工程师完成( )等工作后，对工程变更的费用和工期作出评估。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"确定工程变更项目与原工程项目之间的类似程度和难易程度",{"key":24,"text":162,"correct":22},"确定工程变更项目与相关工程项目之间的类似程度和难易程度",{"key":28,"text":164,"correct":26},"确定工程变更项目的工程量",{"key":31,"text":166,"correct":22},"确定工程变更项目的范围",{"key":34,"text":168,"correct":26},"确定工程变更的单价或总价","ACE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},953409,"下列关于高程附加调整系数的表述，正确的是( )。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"海拔高程2000～3000m时其高程附加调整系数为1.1",{"key":24,"text":177,"correct":22},"海拔高程3001～3500m时其高程附加调整系数为1.3",{"key":28,"text":179,"correct":22},"海拔高程3501～4000m时其高程附加调整系数为1.2",{"key":31,"text":181,"correct":22},"海拔高程4001～4500m时其高程附加调整系数为1.4",{"key":34,"text":183,"correct":26},"海拔高程4000m以上的，高程附加调整系数在以上基础上由发包人和监理人协商确定","AE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":169,"analysis":37},953410,"施工监理收费标准的调整系数包括( )。",[189,191,193,195,197],{"key":20,"text":190,"correct":26},"专业调整系数",{"key":24,"text":192,"correct":22},"工程工作量差异调整系数",{"key":28,"text":194,"correct":26},"工程复杂程度调整系数",{"key":31,"text":196,"correct":22},"专项调整系数",{"key":34,"text":198,"correct":26},"附加调整系数",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},953411,"在工程建设过程中的( )，可作为建筑工程项目保险的保险标的。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"建筑用机器、设备及有关装置",{"key":24,"text":206,"correct":26},"工程所有人所提供的物料及项目",{"key":28,"text":208,"correct":26},"安装工程项目",{"key":31,"text":210,"correct":22},"土木建筑工程项目",{"key":34,"text":212,"correct":26},"工地内已有的建筑物","ABCE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":36,"analysis":37},953412,"在我国，建筑工程一切险的责任范围主要包括( )。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"领用公用运输用执照的车辆、船舶、飞机的损失",{"key":24,"text":221,"correct":26},"因空中运行物体坠落引起的财产损失",{"key":28,"text":223,"correct":26},"自然灾害和意外事故",{"key":31,"text":225,"correct":26},"人为因素所导致的经济损失",{"key":34,"text":227,"correct":26},"原材料的缺陷或工艺不善所引起的事故",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":111,"analysis":37},953413,"建筑工程第三者责任保险的赔偿责任限额可分为( )。",[232,234,236,238,240],{"key":20,"text":233,"correct":26},"每次事故、每个人的人身伤亡的赔偿限额",{"key":24,"text":235,"correct":22},"每个人的财产损失的赔偿限额",{"key":28,"text":237,"correct":26},"每次事故人身伤亡的赔偿限额",{"key":31,"text":239,"correct":26},"每次事故财产损失的赔偿限额",{"key":34,"text":241,"correct":26},"保险单总赔偿限额",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},953414,"下列属于企业财产保险的是( )。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"建筑工程一切险",{"key":24,"text":249,"correct":22},"安装工程一切险",{"key":28,"text":251,"correct":26},"财产保险综合险",{"key":31,"text":253,"correct":26},"房屋抵押贷款保险",{"key":34,"text":255,"correct":26},"房屋利益保险","CDE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},953415,"工程保险的特殊性，主要表现在( )。",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"保险金额的变动性",{"key":24,"text":264,"correct":26},"投保人的广泛性",{"key":28,"text":266,"correct":26},"保障的综合性",{"key":31,"text":268,"correct":26},"保险期限的不确定性",{"key":34,"text":270,"correct":22},"保障对象的广泛性","ABCD",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":52,"analysis":37},953416,"在发生( )情形时，保证人应承担保证责任。",[276,278,280,282,284],{"key":20,"text":277,"correct":26},"投标人在招标文件规定的投标有效期内未经招标人许可撤回投标文件",{"key":24,"text":279,"correct":26},"投标人中标后未在招标文件规定的时间内与招标人签订《建设工程施工合同》",{"key":28,"text":281,"correct":22},"投标人因不可抗力事件未履行合同义务",{"key":31,"text":283,"correct":22},"投标人在招标文件要求投标文件的截止时间前，修改已提交的投标文件",{"key":34,"text":285,"correct":26},"投标人中标后不能按照招标文件的规定提供履约保证",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":213,"analysis":37},953417,"承包商保证担保是指以承包商为被保证人的担保，主要包括( )。",[290,292,294,296,298],{"key":20,"text":291,"correct":26},"保修金担保",{"key":24,"text":293,"correct":26},"承包商履约担保",{"key":28,"text":295,"correct":26},"分包履约担保",{"key":31,"text":297,"correct":22},"业主工程款支付担保",{"key":34,"text":299,"correct":26},"投标担保",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":52,"analysis":37},953418,"企业公开发行债券应具备的条件包括( )。",[304,306,308,310,312],{"key":20,"text":305,"correct":26},"最近3年可分配利润可以支付企业债券1年的利息",{"key":24,"text":307,"correct":26},"筹集资金的投向符合国家产业政策和行业发展方向，所需相关手续齐全",{"key":28,"text":309,"correct":22},"累计债券余额不超过企业净资产的30%",{"key":31,"text":311,"correct":22},"股份有限公司的净资产不低于人民币6000万元，有限责任公司和其他类型企业的净资产不低于人民币3000万元",{"key":34,"text":313,"correct":26},"最近3年没有重大违法违规行为",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":36,"analysis":37},953419,"筹资保证在建设项目筹资活动中可能实际运用的主要方式有( )。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"建设方保证",{"key":24,"text":321,"correct":26},"第三方保证",{"key":28,"text":323,"correct":26},"施工方保证",{"key":31,"text":325,"correct":26},"政府保证",{"key":34,"text":327,"correct":26},"保险保证",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":111,"analysis":37},953420,"编制资金筹措计划时应当( )。",[332,334,336,338,340],{"key":20,"text":333,"correct":26},"使资金筹措计划与资金投入计划平衡、衔接",{"key":24,"text":335,"correct":22},"在资金使用安排上，先安排使用债务资金，然后再安排使用项目资本金",{"key":28,"text":337,"correct":26},"尽量减轻建设项目生产运营期的财务风险和运营风险，降低建设项目的还款压力",{"key":31,"text":339,"correct":26},"在事前做好债务融资信用保证的安排和准备",{"key":34,"text":341,"correct":26},"对不同的债务资金的利率水平和资金成本进行分析和测算",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":213,"analysis":37},953421,"短期融资券、中期票据筹资的优点主要有( )。",[346,348,350,352,354],{"key":20,"text":347,"correct":26},"融资成本低",{"key":24,"text":349,"correct":26},"发行门槛较低",{"key":28,"text":351,"correct":26},"能提高企业信誉和提升企业形象",{"key":31,"text":353,"correct":22},"期限短",{"key":34,"text":355,"correct":26},"便利快捷",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":370,"analysis":37},953422,"融资租赁过程中，涉及的合同有( )。",[360,362,364,366,368],{"key":20,"text":361,"correct":26},"出租人与银行的借贷合同",{"key":24,"text":363,"correct":22},"承租人与银行的借贷合同",{"key":28,"text":365,"correct":26},"出租人与供货商之间的买卖合同",{"key":31,"text":367,"correct":26},"出租人与承租人之间的租赁合同",{"key":34,"text":369,"correct":22},"承租人与供货商之间的租赁合同","ACD",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":213,"analysis":37},953423,"编制建设项目财务计划的主要依据包括( )。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"经批准的建设项目初步设计概算和施工图预算",{"key":24,"text":378,"correct":26},"项目建设进度计划",{"key":28,"text":380,"correct":26},"债务资金筹资方案",{"key":31,"text":382,"correct":22},"项目投资支出计划",{"key":34,"text":384,"correct":26},"建设项目投资各方的投资协议或合同",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":271,"analysis":37},953424,"建设项目财务管理的基本任务，包括( )。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"参与建设项目经济效益、财务效益的分析和测算",{"key":24,"text":392,"correct":26},"参与工程概算、预算审查",{"key":28,"text":394,"correct":26},"落实建设项目内部经济责任制和财务内部控制制度",{"key":31,"text":396,"correct":26},"加强建设项目财务信息的收集和运用工作",{"key":34,"text":398,"correct":22},"办理国际商业银行贷款的申请和审批手续",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":271,"analysis":37},953425,"银行贷款筹资中，建设单位事前要做好筹资策划，应当( )。",[403,405,407,409,411],{"key":20,"text":404,"correct":26},"编制还款计划",{"key":24,"text":406,"correct":26},"合理确定贷款金额和用款计划、贷款期限和还款计划，避免偿债风险",{"key":28,"text":408,"correct":26},"选择有实力、有信誉、服务好的贷款银行",{"key":31,"text":410,"correct":26},"合理确定贷款利率、结息间隔、利息支付方式和宽限期",{"key":34,"text":412,"correct":22},"设置贷款发放账户和还款准备金账户",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":370,"analysis":37},953426,"采用新设法人融资方式的建设项目，项目资本金应由项目投资人按投资协议约定的( )，按时、足额缴付。",[417,419,421,423,425],{"key":20,"text":418,"correct":26},"出资方式",{"key":24,"text":420,"correct":22},"监督管理程序",{"key":28,"text":422,"correct":26},"出资金额",{"key":31,"text":424,"correct":26},"出资计划",{"key":34,"text":426,"correct":22},"资金筹措方案",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":81,"analysis":37},953427,"财务预算是项目建设期间反映建设项目( )的预算。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"财务计划",{"key":24,"text":434,"correct":26},"现金收支",{"key":28,"text":436,"correct":26},"项目建设成果",{"key":31,"text":438,"correct":26},"财务状况",{"key":34,"text":440,"correct":22},"投资计划",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":455,"analysis":37},953428,"从建设项目筹资的实践来看，普遍采用的担保方式是( )。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"留置",{"key":24,"text":448,"correct":26},"抵押",{"key":28,"text":450,"correct":26},"保证",{"key":31,"text":452,"correct":22},"定金",{"key":34,"text":454,"correct":26},"质押","BCE",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":455,"analysis":37},953429,"直接融资是指没有金融中介介入的资金融通，主要包括( )等。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"融资租赁",{"key":24,"text":463,"correct":26},"发行企业债券",{"key":28,"text":465,"correct":26},"发行短期融资券",{"key":31,"text":467,"correct":22},"委托贷款",{"key":34,"text":469,"correct":26},"发行中期票据",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":213,"analysis":37},953430,"工程建设过程中出现( )情况的，建设单位应及时报告上级主管部门。",[474,476,478,480,482],{"key":20,"text":475,"correct":26},"较大金额索赔",{"key":24,"text":477,"correct":26},"审计发现的重大违纪问题",{"key":28,"text":479,"correct":26},"配套资金严重不到位",{"key":31,"text":481,"correct":22},"建筑材料质量严重不合格",{"key":34,"text":483,"correct":26},"一次性金额较大的资金使用或者在短期内累计较大的资金使用",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":184,"analysis":37},953431,"下列不属于财务计划编制原则的是( )。",[488,490,492,494,496],{"key":20,"text":489,"correct":26},"建设项目年度财务计划，应与批准的建设项目初步概算相符",{"key":24,"text":491,"correct":22},"建设项目年度财务计划投资支出安排应与实际安排的施工进度的工作量基本相符",{"key":28,"text":493,"correct":22},"资金筹措计划要同投资支出计划衔接，项目资本金要按投资协议规定，按期、按量足额到位",{"key":31,"text":495,"correct":22},"动员内部资源计划要和以前年度的建设结余资金和库存多余物资的利用结合起来，充分挖掘内部潜力",{"key":34,"text":497,"correct":26},"建设项目财务计划的编制程序，应坚持自上而下、项目细化、分项编制的基本原则",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":512,"analysis":37},953432,"建设项目内部审计实施阶段的主要任务是( )。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"制定审计计划",{"key":24,"text":505,"correct":22},"审计工作作出合理安排",{"key":28,"text":507,"correct":26},"获取充分、相关、可靠的审计证据",{"key":31,"text":509,"correct":26},"完整、准确地记录审计程序的执行过程",{"key":34,"text":511,"correct":22},"提出审计结论和建议","CD",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":271,"analysis":37},953433,"建设项目内部审计的重点是( )。",[517,519,521,523,525],{"key":20,"text":518,"correct":26},"突出项目建设的关键环节，把好投资效益关",{"key":24,"text":520,"correct":26},"突出内控审计，规范各项管理制度",{"key":28,"text":522,"correct":26},"突出资金管理，促进资金安全高效使用",{"key":31,"text":524,"correct":26},"突出风险审计，提高建设项目风险管理水平",{"key":34,"text":526,"correct":22},"突出对企业能力的评审",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":213,"analysis":37},953434,"下列与建设项目内部控制要求相符的是( )。",[531,533,535,537,539],{"key":20,"text":532,"correct":26},"内部控制目标要同建设项目总体目标保持一致",{"key":24,"text":534,"correct":26},"内部控制要贯穿项目建设全过程，覆盖全部业务和事项",{"key":28,"text":536,"correct":26},"内部控制，要合理分解项目建设的目标和过程",{"key":31,"text":538,"correct":22},"内部控制的政策和程序不能随意变化",{"key":34,"text":540,"correct":26},"建设单位的内部控制要与各参与方内部控制相容",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":555,"analysis":37},953435,"建设项目管理中必须分离的不相容职务，主要包括( )。",[545,547,549,551,553],{"key":20,"text":546,"correct":26},"授权审批职务与业务执行职务",{"key":24,"text":548,"correct":26},"业务经办职务与审核监督职务",{"key":28,"text":550,"correct":22},"业务经办职务与业务执行职务",{"key":31,"text":552,"correct":26},"业务经办职务与会计记录职务",{"key":34,"text":554,"correct":26},"业务经办职务与财产保管职务","ABDE",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":111,"analysis":37},953436,"建设项目财务内部控制的原则包括( )。",[560,562,564,566,568],{"key":20,"text":561,"correct":26},"职责分工原则",{"key":24,"text":563,"correct":22},"适用性原则",{"key":28,"text":565,"correct":26},"凭证制度原则",{"key":31,"text":567,"correct":26},"制衡性原则",{"key":34,"text":569,"correct":26},"核对检查原则",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":271,"analysis":37},953437,"建设项目内部控制的目标主要包括( )。",[574,576,578,580,582],{"key":20,"text":575,"correct":26},"提高投资效益，促进建设项目总体目标的实现",{"key":24,"text":577,"correct":26},"保证建设项目资产的安全、完整和有效使用",{"key":28,"text":579,"correct":26},"遵守国家的有关法律法规和建设单位内部的规章制度",{"key":31,"text":581,"correct":26},"保证财务会计及项目建设信息资料的真实、准确、及时、可靠",{"key":34,"text":583,"correct":22},"将建设项目工程总造价控制在审定的施工图总预算之内",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":81,"analysis":37},953438,"建立和实施内部控制应遵循的原则有( )。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"独立性原则",{"key":24,"text":591,"correct":26},"适应性原则",{"key":28,"text":593,"correct":26},"全面性原则",{"key":31,"text":595,"correct":26},"成本效益原则",{"key":34,"text":597,"correct":22},"合法性原则",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":256,"analysis":37},953439,"工程造价审计，主要包括( )。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"建设资金筹措审计",{"key":24,"text":605,"correct":22},"资金支付与账务处理审计",{"key":28,"text":607,"correct":26},"设计概算审计",{"key":31,"text":609,"correct":26},"施工图预算审计",{"key":34,"text":611,"correct":26},"工程量清单审计",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":555,"analysis":37},953440,"在项目实施过程中建立的生产管理体系主要包括( )。",[616,618,620,622,624],{"key":20,"text":617,"correct":26},"生产管理指挥体系",{"key":24,"text":619,"correct":26},"安全、环保管理体系",{"key":28,"text":621,"correct":22},"档案管理体系",{"key":31,"text":623,"correct":26},"原材料供应与检验体系",{"key":34,"text":625,"correct":26},"产品营销和市场开拓体系",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":213,"analysis":37},953441,"生产准备机构的主要任务包括( )。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"编制试车预案",{"key":24,"text":633,"correct":26},"制定生产准备实施办法和各项管理制度",{"key":28,"text":635,"correct":26},"制定生产准备工作大纲和生产准备工作网络计划",{"key":31,"text":637,"correct":22},"制定建设项目资金筹措计划",{"key":34,"text":639,"correct":26},"落实相关责任人",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":213,"analysis":37},953442,"产品市场营销准备工作主要包括( )。",[644,646,648,650,652],{"key":20,"text":645,"correct":26},"调查产品市场情况",{"key":24,"text":647,"correct":26},"建立产品市场营销网络",{"key":28,"text":649,"correct":26},"组织产品售后服务",{"key":31,"text":651,"correct":22},"与协作单位签订正式合同",{"key":34,"text":653,"correct":26},"确定产品市场营销策略",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":271,"analysis":37},953443,"生产准备机构设立的时间，一般要根据( )进行统一安排。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"项目建设不同阶段的需求",{"key":24,"text":661,"correct":26},"生产技术的复杂程度",{"key":28,"text":663,"correct":26},"建设项目的性质、",{"key":31,"text":665,"correct":26},"项目建设进度",{"key":34,"text":667,"correct":22},"建设项目总体目标",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":370,"analysis":37},953444,"一个大中型生产性项目所需的物资品种繁多、数量大，一般可分为( )等。",[672,674,676,678,680],{"key":20,"text":673,"correct":26},"主要材料",{"key":24,"text":675,"correct":22},"地方材料",{"key":28,"text":677,"correct":26},"辅助材料",{"key":31,"text":679,"correct":26},"备品备件",{"key":34,"text":681,"correct":22},"特殊材料",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":271,"analysis":37},953445,"试生产考核的内容主要包括( )。",[686,688,690,692,694],{"key":20,"text":687,"correct":26},"产品质量",{"key":24,"text":689,"correct":26},"装置生产能力",{"key":28,"text":691,"correct":26},"单位产品消耗定额",{"key":31,"text":693,"correct":26},"生产成本",{"key":34,"text":695,"correct":22},"岗位人员的反应能力",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":111,"analysis":37},953446,"在项目实施过程中，应坚持( )的人员招聘原则。",[700,702,704,706,708],{"key":20,"text":701,"correct":26},"提高劳动生产率",{"key":24,"text":703,"correct":22},"实用、高效、经济",{"key":28,"text":705,"correct":26},"以设计为依据",{"key":31,"text":707,"correct":26},"适时招聘",{"key":34,"text":709,"correct":26},"公开、公平、公正",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":81,"analysis":37},953447,"安全保障是生产准备的重要内容之一，随着生产装置和工艺路线的形成，必须( )。",[714,716,718,720,722],{"key":20,"text":715,"correct":22},"制度安全施工方案",{"key":24,"text":717,"correct":26},"落实安全责任",{"key":28,"text":719,"correct":26},"建立安全制度",{"key":31,"text":721,"correct":26},"实行安全教育",{"key":34,"text":723,"correct":22},"购进安全防护设备",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":36,"analysis":37},953448,"根据国家现行有关规定，建设项目竣工验收一般应具备的条件有( )。",[728,730,732,734,736],{"key":20,"text":729,"correct":22},"对区域经济和社会发展的带动作用",{"key":24,"text":731,"correct":26},"生产准备工作能适应投产的需要",{"key":28,"text":733,"correct":26},"生产性项目和辅助性公用设施已按设计要求建成，能满足生产使用",{"key":31,"text":735,"correct":26},"必需的生活设施已按设计要求建成",{"key":34,"text":737,"correct":26},"建设项目的技术档案资料已经按照要求整理归档，并可方便查阅",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]