[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-690-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":676},{"id":5,"name":6,"category":7,"favorite":8},690,"投资建设项目实施","建筑工程",0,6,50,433,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,223,235,247,259,269,281,290,302,314,326,344,359,374,389,404,419,434,448,462,477,492,506,520,535,549,563,577,592,605,619,633,648,662],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},953299,1,"单选题","建设单位和施工单位应按照\"三同时\"的要求，以( )形式将环保工程设施的施工建设进展情况上报政府环境保护行政主管部门，接受环境保护部门的检查。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","日报",false,{"key":24,"text":25,"correct":22},"B","月报",{"key":27,"text":28,"correct":29},"C","季报",true,{"key":31,"text":32,"correct":22},"D","年报","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},953300,"关于土地所有权和使用权的表述中，错误的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"我国实行土地社会主义公有制，即全民所有制和劳动集体所有制",{"key":24,"text":41,"correct":22},"国有土地和农民集体所有土地，可依法确定给单位和个人使用",{"key":27,"text":43,"correct":29},"城市市区的土地属于农民集体所有",{"key":31,"text":45,"correct":22},"土地使用权可依法转让",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},953301,"建设单位应当向施工单位提供施工现场及毗邻区域内供水、排水、供电、供气、供热、通信、广播电视等地下管线资料，气象和水文观测资料并保证资料的( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"真实、系统、合理",{"key":24,"text":53,"correct":22},"准确、合理、适用",{"key":27,"text":55,"correct":29},"真实、准确、完整",{"key":31,"text":57,"correct":22},"完整、适用、可靠",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},953302,"建设单位应向项目主管部门和政府环境保护行政主管部门提交项目环境保护工程预验收申请报告，附试运转监测报告，由( )组织环保工程预验收。",[62,64,66,68],{"key":20,"text":63,"correct":22},"县级政府环境保护行政主管部门",{"key":24,"text":65,"correct":22},"市级政府环境保护行政主管部门",{"key":27,"text":67,"correct":29},"省级政府环境保护行政主管部门",{"key":31,"text":69,"correct":22},"国务院环境保护行政主管部门",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},953303,"下列不属于工程项目的资源条件的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"劳动报酬水平和相关政策",{"key":24,"text":77,"correct":22},"施工机具设备的配备",{"key":27,"text":79,"correct":22},"商品混凝土供给的条件",{"key":31,"text":81,"correct":29},"排污排渣条件",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},953304,"我国建设项目最主要的采购方式是( )。",[86,88,90,92],{"key":20,"text":87,"correct":29},"招标采购",{"key":24,"text":89,"correct":22},"竞争性谈判采购",{"key":27,"text":91,"correct":22},"单一来源采购",{"key":31,"text":93,"correct":22},"询价采购",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},953305,"项目建设( )是项目建设活动的基础和项目管理的依据。",[98,100,102,104],{"key":20,"text":99,"correct":29},"计划",{"key":24,"text":101,"correct":22},"决策",{"key":27,"text":103,"correct":22},"组织",{"key":31,"text":105,"correct":22},"协调",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},953306,"采用工程项目招标应考虑的主要因素不包括( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"拟采用的工程建设承包方式",{"key":24,"text":113,"correct":29},"建设单位的工程技术力量",{"key":27,"text":115,"correct":22},"总包与分包体系",{"key":31,"text":117,"correct":22},"合同类型",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},953307,"建设项目竣工投产或投入使用前，建设单位必须向环境影响评价文件审批部门提交( )，说明环境保护设施运行情况、治理效果、达到标准。",[122,124,126,128],{"key":20,"text":123,"correct":22},"\"环境保护设施预验收合格报告\"",{"key":24,"text":125,"correct":29},"\"环境保护设施竣工验收报告\"",{"key":27,"text":127,"correct":22},"\"环境保护设施验收合格证\"",{"key":31,"text":129,"correct":22},"\"环境保护设施预验收合格证\"",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},953308,"建设单位应自工程竣工验收合格起( )日内，向工程所在地的县级以上地方人民政府建设行政主管部门备案。",[134,136,138,140],{"key":20,"text":135,"correct":22},"7",{"key":24,"text":137,"correct":29},"15",{"key":27,"text":139,"correct":22},"28",{"key":31,"text":141,"correct":22},"45",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},953309,"在建设项目施工阶段，建设单位负责审核( )上报的工程变更，完善工程量清单的单价变更或项目增减的报批手续，处理工程索赔。",[146,148,150,152],{"key":20,"text":147,"correct":22},"总承包单位",{"key":24,"text":149,"correct":22},"设计单位",{"key":27,"text":151,"correct":22},"分包单位",{"key":31,"text":153,"correct":29},"监理单位",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},953310,"下列管理模式中，( )模式一般只适用于建设规模较小、建设周期较短，规模不大、技术不太复杂的建设项目以及高度保密的特殊建设项目。",[158,160,162,164],{"key":20,"text":159,"correct":29},"自行管理",{"key":24,"text":161,"correct":22},"分项委托管理",{"key":27,"text":163,"correct":22},"委托专业机构管理",{"key":31,"text":165,"correct":22},"代建制",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},953311,"建设单位依据政府部门对( )的批复文件，向城乡规划部门申请办理规划许可手续，向国土资源部门申请正式办理建设用地手续。",[170,172,174,176],{"key":20,"text":171,"correct":22},"建设项目申请报告",{"key":24,"text":173,"correct":22},"项目建议书",{"key":27,"text":175,"correct":22},"规划选址和环境影响评价报告",{"key":31,"text":177,"correct":29},"建设项目可行性研究报告",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},953312,"一般来说，工程设计管理方式要与( )保持一致。",[182,184,186,187],{"key":20,"text":183,"correct":22},"采用的工程建设承包方式",{"key":24,"text":185,"correct":29},"建设项目管理模式",{"key":27,"text":113,"correct":22},{"key":31,"text":188,"correct":22},"建设单位的设计管理水平",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},953313,"需要有关部门批准或核准、以划拨方式取得国有土地使用权的，建设项目建设单位在报送有关部门批准或核准前，应向( )申请核发选址意见书。",[193,195,197,199],{"key":20,"text":194,"correct":22},"城市规划部门",{"key":24,"text":196,"correct":29},"城乡规划部门",{"key":27,"text":198,"correct":22},"国土资源部门",{"key":31,"text":200,"correct":22},"环境保护部门",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},953314,"关于建设单位对施工准备阶段的管理的表述中，错误的是( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"办理规划、建设等报建、施工放线测量和工程开工前的各项手续",{"key":24,"text":208,"correct":22},"审批工程监理单位编制的监理规划和审核项目监理部编制的监理实施细则",{"key":27,"text":210,"correct":29},"检查工程质量保证体系、安全保证体系的运行情况",{"key":31,"text":212,"correct":22},"审核工程监理单位审批后上报的承包人的施工组织设计",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},953315,"在项目建设管理中，( )自始至终是建设项目管理的主导者和责任人，其主要责任是对项目建设的全过程、全方位实施有效管理，保证项目建设总体目标的实现。",[217,219,220,222],{"key":20,"text":218,"correct":22},"施工单位",{"key":24,"text":149,"correct":22},{"key":27,"text":221,"correct":29},"建设单位",{"key":31,"text":153,"correct":22},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},953316,"下列属于建设单位对施工阶段的管理工作的是( )。",[227,229,231,233],{"key":20,"text":228,"correct":22},"主持召开第一次工地会议",{"key":24,"text":230,"correct":29},"建立管理工作月报制度，逐月检查进度计划完成情况",{"key":27,"text":232,"correct":22},"编制工程建设施工的总体进度计划和年度资金使用计划",{"key":31,"text":234,"correct":22},"审核重要工序、关键部位的施工技术方案",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},953317,"关于建设项目环境影响评价制度的表述中，正确的是( )。",[239,241,243,245],{"key":20,"text":240,"correct":29},"对可能造成重大环境影响的建设项目，应当编制环境影响报告书",{"key":24,"text":242,"correct":22},"对可能造成严重影响影响的建设项目，应编制环境影响报告表",{"key":27,"text":244,"correct":22},"对环境影响很小的建设项目，应填报环境影响报告表",{"key":31,"text":246,"correct":22},"对可能造成轻度影响影响的建设项目，应编制环境影响登记表",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},953318,"根据《中华人民共和国建筑法》的规定，工程开工前，建设单位应当按照国家有关规定，向工程所在地( )申请领取施工许可证。",[251,253,255,257],{"key":20,"text":252,"correct":22},"社区级人民政府建设行政主管部门",{"key":24,"text":254,"correct":29},"县级以上人民政府建设行政主管部门",{"key":27,"text":256,"correct":22},"市级以上人民政府建设行政主管部门",{"key":31,"text":258,"correct":22},"省级以上人民政府建设行政主管部门",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":27,"analysis":33},953319,"凡由承包单位采购的货物，( )不得指定货物的生产厂和供货商。",[263,264,266,267],{"key":20,"text":149,"correct":22},{"key":24,"text":265,"correct":22},"使用单位",{"key":27,"text":221,"correct":29},{"key":31,"text":268,"correct":22},"政府监督管理部门",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},953320,"建设项目管理服务采购的评价，一般不以( )为主要评价因素。",[273,275,277,279],{"key":20,"text":274,"correct":29},"费用报价高低",{"key":24,"text":276,"correct":22},"服务机构的资质",{"key":27,"text":278,"correct":22},"服务机构的实力",{"key":31,"text":280,"correct":22},"服务机构的服务质量",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},953321,"不管采用哪种工程设计管理方式，最终决策人和最终风险承担人都是( )。",[285,287,288,289],{"key":20,"text":286,"correct":22},"施工总承包单位",{"key":24,"text":149,"correct":22},{"key":27,"text":265,"correct":22},{"key":31,"text":221,"correct":29},{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},953322,"根据《国务院关于投资体制改革的决定》，对列入《政府核准的投资项目目录》内的企业投资项目，以及外商投资项目，实行( )。",[294,296,298,300],{"key":20,"text":295,"correct":29},"核准制",{"key":24,"text":297,"correct":22},"审批制",{"key":27,"text":299,"correct":22},"备案制",{"key":31,"text":301,"correct":22},"报告制",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},953323,"目前，只在( )建设项目采用\"代建制\"。",[306,308,310,312],{"key":20,"text":307,"correct":22},"企业投资的",{"key":24,"text":309,"correct":22},"政府注入资本金的",{"key":27,"text":311,"correct":29},"政府直接投资的非经营性",{"key":31,"text":313,"correct":22},"外商投资的",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},953324,"实行备案制的企业投资建设项目，由( )决策。",[318,320,322,324],{"key":20,"text":319,"correct":22},"安全生产监督管理部门",{"key":24,"text":321,"correct":29},"企业自主",{"key":27,"text":323,"correct":22},"建设行政主管部门",{"key":31,"text":325,"correct":22},"政府备案管理部门",{"id":327,"libraryId":5,"type":328,"typeLabel":329,"stem":330,"options":331,"answer":343,"analysis":33},953325,2,"多选题","工程施工阶段的设计管理包括( )。",[332,334,336,338,340],{"key":20,"text":333,"correct":29},"设计交底",{"key":24,"text":335,"correct":29},"设计图会审",{"key":27,"text":337,"correct":29},"设计变更",{"key":31,"text":339,"correct":22},"设计方案审核",{"key":341,"text":342,"correct":29},"E","完工验收阶段设计报告","ABCE",{"id":345,"libraryId":5,"type":328,"typeLabel":329,"stem":346,"options":347,"answer":358,"analysis":33},953326,"工程勘察阶段，建设单位项目管理的工作内容包括( )。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"主持研究和审查确认勘察方案",{"key":24,"text":351,"correct":29},"编制勘察任务书，拟定工程勘察工作计划",{"key":27,"text":353,"correct":29},"委托勘察单位，签订工程勘察合同",{"key":31,"text":355,"correct":29},"审查勘查工作纲要",{"key":341,"text":357,"correct":29},"监督协助勘察工作","BCDE",{"id":360,"libraryId":5,"type":328,"typeLabel":329,"stem":361,"options":362,"answer":373,"analysis":33},953327,"工程设计在满足建设项目功能要求的同时，始终贯彻的基本原则包括( )。",[363,365,367,369,371],{"key":20,"text":364,"correct":29},"贯彻国家的经济建设方针和政策",{"key":24,"text":366,"correct":29},"合理利用资源，节约能源",{"key":27,"text":368,"correct":29},"高度重视技术进步，选用的技术要先进适用",{"key":31,"text":370,"correct":29},"坚持经济合理",{"key":341,"text":372,"correct":22},"以人为本，坚持持续改进","ABCD",{"id":375,"libraryId":5,"type":328,"typeLabel":329,"stem":376,"options":377,"answer":388,"analysis":33},953328,"建设项目业主应负责设计过程中与外部协作的接口管理的主要内容有( )。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"设计方案比选和设计大纲审查",{"key":24,"text":381,"correct":29},"负责外部协作条件的取证",{"key":27,"text":383,"correct":29},"办理专题设计的报送、评审和审批",{"key":31,"text":385,"correct":22},"组织设计方案成果审查",{"key":341,"text":387,"correct":22},"工程勘察主要技术成果与参数的审查","BC",{"id":390,"libraryId":5,"type":328,"typeLabel":329,"stem":391,"options":392,"answer":403,"analysis":33},953329,"民用建筑工程建设项目，一般分为( )阶段。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"扩初设计",{"key":24,"text":396,"correct":22},"技术设计",{"key":27,"text":398,"correct":29},"方案设计",{"key":31,"text":400,"correct":29},"初步设计",{"key":341,"text":402,"correct":29},"施工图设计","CDE",{"id":405,"libraryId":5,"type":328,"typeLabel":329,"stem":406,"options":407,"answer":418,"analysis":33},953330,"施工图设计深度应( )。",[408,410,412,414,416],{"key":20,"text":409,"correct":29},"满足土建施工的要求",{"key":24,"text":411,"correct":29},"满足设备材料的订货",{"key":27,"text":413,"correct":22},"满足设计方案中有关试验、设备制造方面的要求",{"key":31,"text":415,"correct":29},"能据以进行施工组织设计",{"key":341,"text":417,"correct":29},"满足施工质量检验、完工验收的要求","ABDE",{"id":420,"libraryId":5,"type":328,"typeLabel":329,"stem":421,"options":422,"answer":433,"analysis":33},953331,"工程地质初步勘察的应进行的基本工作有( )。",[423,425,427,429,431],{"key":20,"text":424,"correct":29},"初步查明地质、构造、岩石和土壤的物理力学性质",{"key":24,"text":426,"correct":22},"提供不良地质问题防治工程所需的计算参数及资料",{"key":27,"text":428,"correct":22},"查明地下水的埋藏条件和侵蚀、渗透性、水位变化幅度及规律",{"key":31,"text":430,"correct":29},"查明场地不良地质现象的成因、分布范围、对场地稳定性的影响程度",{"key":341,"text":432,"correct":29},"对设计烈度为7度及7度以上的建筑物，应制定场地和地基的地震效应","ADE",{"id":435,"libraryId":5,"type":328,"typeLabel":329,"stem":436,"options":437,"answer":418,"analysis":33},953332,"初步设计应满足的基本要求是( )。",[438,440,442,444,446],{"key":20,"text":439,"correct":29},"主要设备和材料明细表可作为订货依据",{"key":24,"text":441,"correct":29},"多方案比较",{"key":27,"text":443,"correct":22},"总概算不应超过可行性研究估算投资总额的15%",{"key":31,"text":445,"correct":29},"满足施工图设计的准备工作要求",{"key":341,"text":447,"correct":29},"要有详尽的工程量清单和计算书，主要工程量误差应在允许范围以内",{"id":449,"libraryId":5,"type":328,"typeLabel":329,"stem":450,"options":451,"answer":403,"analysis":33},953333,"施工设计图主要审查的内容包括( )。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"工程措施是否合适，所提技术标准是否满足工程需要",{"key":24,"text":455,"correct":22},"在平面和空间的布置上是否有交叉和矛盾",{"key":27,"text":457,"correct":29},"施工图是否符合现行标准、规程、规范、规定的要求",{"key":31,"text":459,"correct":29},"设计图是否符合现场和施工的实际条件",{"key":341,"text":461,"correct":29},"深度是否达到施工和安装的要求",{"id":463,"libraryId":5,"type":328,"typeLabel":329,"stem":464,"options":465,"answer":476,"analysis":33},953334,"施工阶段和验收阶段的工程设计管理工作包括( )。",[466,468,470,472,474],{"key":20,"text":467,"correct":29},"组织设计交底",{"key":24,"text":469,"correct":29},"控制和审查设计单位提交的设计变更",{"key":27,"text":471,"correct":22},"组织设计单位参加完工验收、投运前的大型建筑物安全鉴定",{"key":31,"text":473,"correct":22},"向设计单位提出对工艺设施的改进建议、完善生产工艺和生产条件的意见",{"key":341,"text":475,"correct":22},"参加试运行","AB",{"id":478,"libraryId":5,"type":328,"typeLabel":329,"stem":479,"options":480,"answer":491,"analysis":33},953335,"水文测验的工作内容包括( )。",[481,483,485,487,489],{"key":20,"text":482,"correct":29},"水位、流速、泥沙、水下地形冲淤变化、蒸发、水温、冰情、地下水位等工作项目的观测",{"key":24,"text":484,"correct":29},"为水利水电建设项目的水资料评价、利用与保护开发规划设计和运行调度与管理提供水文分析资料",{"key":27,"text":486,"correct":22},"水文地质测绘",{"key":31,"text":488,"correct":22},"评价地下水资源，确定地下水文特征参数，提出合理的开采方案或防治处理措施方案",{"key":341,"text":490,"correct":29},"为建设期间防洪、抗险等提供情报","ABE",{"id":493,"libraryId":5,"type":328,"typeLabel":329,"stem":494,"options":495,"answer":373,"analysis":33},953336,"施工图设计交底和设计图审查的目的是( )。",[496,498,500,502,504],{"key":20,"text":497,"correct":29},"保证工程质量",{"key":24,"text":499,"correct":29},"使施工单位熟悉设计图、了解工程特点、设计意图",{"key":27,"text":501,"correct":29},"及时发现设计图错误并进行修改",{"key":31,"text":503,"correct":29},"使施工单位了解关键部位的质量要求",{"key":341,"text":505,"correct":22},"满足设备材料订货的要求",{"id":507,"libraryId":5,"type":328,"typeLabel":329,"stem":508,"options":509,"answer":373,"analysis":33},953337,"建设单位会同设计单位对勘察单位编制的勘查工作纲要予以审核，其审查内容包括( )。",[510,512,514,516,518],{"key":20,"text":511,"correct":29},"勘查工作纲要是否符合勘察合同规定",{"key":24,"text":513,"correct":29},"勘查工作纲要能否实现合同要求",{"key":27,"text":515,"correct":29},"勘查工作方案是否合理",{"key":31,"text":517,"correct":29},"勘查工作进度是否满足要求",{"key":341,"text":519,"correct":22},"勘察方案是否具有使用价值",{"id":521,"libraryId":5,"type":328,"typeLabel":329,"stem":522,"options":523,"answer":534,"analysis":33},953338,"工程设计评审由建设项目业主组织有关专家或机构进行，其评审的目的是( )。",[524,526,528,530,532],{"key":20,"text":525,"correct":22},"促进新技术的应用",{"key":24,"text":527,"correct":29},"控制设计成果质量",{"key":27,"text":529,"correct":22},"优选工程设计单位",{"key":31,"text":531,"correct":29},"优化工程设计",{"key":341,"text":533,"correct":29},"提高投资效益","BDE",{"id":536,"libraryId":5,"type":328,"typeLabel":329,"stem":537,"options":538,"answer":548,"analysis":33},953339,"设计方案评审的主要内容包括( )。",[539,541,543,544,546],{"key":20,"text":540,"correct":29},"总体方案评审",{"key":24,"text":542,"correct":22},"设计总说明审查",{"key":27,"text":339,"correct":29},{"key":31,"text":545,"correct":29},"专业设计方案评审",{"key":341,"text":547,"correct":22},"总体审核","ACD",{"id":550,"libraryId":5,"type":328,"typeLabel":329,"stem":551,"options":552,"answer":358,"analysis":33},953340,"为了保证( )原则得到体现，我国有关招标投标的法律法规对招标方和投标方的行为作出了规范性约束。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"自愿",{"key":24,"text":556,"correct":29},"公开",{"key":27,"text":558,"correct":29},"公平",{"key":31,"text":560,"correct":29},"公正",{"key":341,"text":562,"correct":29},"诚实信用",{"id":564,"libraryId":5,"type":328,"typeLabel":329,"stem":565,"options":566,"answer":418,"analysis":33},953341,"根据投资管理体制改革要求，需要审批的工程建设项目，有( )情形的，可以不进行施工招标，但必须经项目审批部门批准。",[567,569,571,573,575],{"key":20,"text":568,"correct":29},"涉及国家安全、国家秘密或者抢险救灾而不适宜招标的",{"key":24,"text":570,"correct":29},"利用扶贫资金实行以工代赈需要使用农民工的",{"key":27,"text":572,"correct":22},"关系社会公共利益的",{"key":31,"text":574,"correct":29},"施工企业自建自用的工程，且该施工企业资质等级符合工程要求的",{"key":341,"text":576,"correct":29},"在建工程追加的附属小型工程或者主体加层工程，原中标人仍具备承包能力的",{"id":578,"libraryId":5,"type":328,"typeLabel":329,"stem":579,"options":580,"answer":591,"analysis":33},953342,"公开招标的缺点在于( )。",[581,583,585,587,589],{"key":20,"text":582,"correct":29},"招标周期长",{"key":24,"text":584,"correct":29},"工作复杂",{"key":27,"text":586,"correct":22},"选择余地小",{"key":31,"text":588,"correct":29},"投入资金多",{"key":341,"text":590,"correct":22},"程序复杂","ABD",{"id":593,"libraryId":5,"type":328,"typeLabel":329,"stem":594,"options":595,"answer":604,"analysis":33},953343,"工程监理工作的主要手段是( )。",[596,597,599,600,602],{"key":20,"text":103,"correct":22},{"key":24,"text":598,"correct":29},"规划",{"key":27,"text":105,"correct":29},{"key":31,"text":601,"correct":29},"控制",{"key":341,"text":603,"correct":22},"指挥","BCD",{"id":606,"libraryId":5,"type":328,"typeLabel":329,"stem":607,"options":608,"answer":373,"analysis":33},953344,"根据《中华人民共和国招标投标法》和《工程建设项目招标范围和规模标准规定》，( )项目的施工，必须采用招标方式发包。",[609,611,613,615,617],{"key":20,"text":610,"correct":29},"大型基础设施的",{"key":24,"text":612,"correct":29},"公用事业的",{"key":27,"text":614,"correct":29},"使用国有资金投资项目的施工单项合同估算价在200万元人民币以上的",{"key":31,"text":616,"correct":29},"使用国际组织援助资金的项目总投资额在3000万元人民币以上的",{"key":341,"text":618,"correct":22},"受自然地域环境限制的",{"id":620,"libraryId":5,"type":328,"typeLabel":329,"stem":621,"options":622,"answer":343,"analysis":33},953345,"根据《中华人民共和国招标投标法》以及《工程建设项目招标范围和规模标准规定》，( )项目必须进行招标。",[623,625,627,629,631],{"key":20,"text":624,"correct":29},"关系社会公共利益、公众安全的",{"key":24,"text":626,"correct":29},"全部或者部分使用国有资金投资或者国家融资的",{"key":27,"text":628,"correct":29},"使用国际组织或者外国政府贷款、援助资金的",{"key":31,"text":630,"correct":22},"单项合同估算价在30万元人民币以上的",{"key":341,"text":632,"correct":29},"项目总投资额在3000万元人民币以上的",{"id":634,"libraryId":5,"type":328,"typeLabel":329,"stem":635,"options":636,"answer":647,"analysis":33},953346,"投标文件有( )情形的，经评标委员会评审后按废标处理或否决投标。",[637,639,641,643,645],{"key":20,"text":638,"correct":29},"未加盖投标人公章",{"key":24,"text":640,"correct":22},"法定代表人授权的代理人签字或盖章的",{"key":27,"text":642,"correct":29},"以联合体形式投标，未向招标人提交共同签署的联合体协议书的",{"key":31,"text":644,"correct":29},"与其他投标人串通投标",{"key":341,"text":646,"correct":29},"在投标过程中有商业贿赂行为的","ACDE",{"id":649,"libraryId":5,"type":328,"typeLabel":329,"stem":650,"options":651,"answer":534,"analysis":33},953347,"关于投标人编制投标文件的合理时间，表述正确的是( )。",[652,654,656,658,660],{"key":20,"text":653,"correct":22},"依法必须进行勘察设计招标的项目，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不得少于15日",{"key":24,"text":655,"correct":29},"建筑工程概念性方案设计投标文件编制一般不少于20日",{"key":27,"text":657,"correct":22},"大型公共建筑工程概念性方案设计投标文件编制一般不多于40日",{"key":31,"text":659,"correct":29},"建筑工程实施性方案设计投标文件编制一般不少于45日",{"key":341,"text":661,"correct":29},"招标文件中规定的编制时间不符合要求的，建设主管部门对招标文件不予备案",{"id":663,"libraryId":5,"type":328,"typeLabel":329,"stem":664,"options":665,"answer":373,"analysis":33},953348,"根据《工程建设项目自行招标试行办法》，自行招标的条件包括( )。",[666,668,670,672,674],{"key":20,"text":667,"correct":29},"具有项目法人资格",{"key":24,"text":669,"correct":29},"具有与招标项目规模和复杂程度相适应的工程技术、概预算、财务和工程管理等方面专业技术力量",{"key":27,"text":671,"correct":29},"有从事同类工程建设项目招标的经验",{"key":31,"text":673,"correct":29},"熟悉和掌握招标投标法及有关法规规章",{"key":341,"text":675,"correct":22},"设有专门的招标机构或者拥有2名及以上专职招标业务人员",[677,680,683,686,689,692],{"id":15,"name":678,"category":7,"favorite":679},"领导干部任职前廉政法规知识测试题",92,{"id":681,"name":682,"category":7,"favorite":15},595,"建筑结构与设备",{"id":684,"name":685,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":687,"name":688,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":690,"name":691,"category":7,"favorite":8},534,"BIM工程师",{"id":693,"name":691,"category":7,"favorite":8},535]