[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-690-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},690,"投资建设项目实施","建筑工程",0,5,50,433,[13,34,46,58,68,80,92,104,116,128,140,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,403,415,427,438,450,462,474,486,498,508,520,532,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},953249,1,"单选题","财务管理的基本职能和重要环节是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","财务分析",false,{"key":24,"text":25,"correct":26},"B","财务控制",true,{"key":28,"text":29,"correct":22},"C","财务决策",{"key":31,"text":32,"correct":22},"D","财务预算","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},953250,"下列关于外债资金的表述，错误的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"境内企业所借外债资金，应当严格按批准的用途合理使用，不得挪作他用",{"key":24,"text":41,"correct":22},"境内企业所借外债资金，确需变更用途的，应按原程序报批",{"key":28,"text":43,"correct":26},"境内企业举借短期外债资金的，不得用作流动资金",{"key":31,"text":45,"correct":22},"使用外债资金的固定资产投资项目，应当实行建设项目法人责任制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},953251,"在建设项目内部控制的主要内容中，( )是指建设单位内部为保证项目建设业务活动按一定的程序有效运行，而制定的业务处理过程必须具备的环节和工作顺序。",[50,52,54,56],{"key":20,"text":51,"correct":22},"财产保护控制",{"key":24,"text":53,"correct":22},"会计系统控制",{"key":28,"text":55,"correct":22},"绩效考核控制",{"key":31,"text":57,"correct":26},"业务程序控制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},953252,"项目财务内部控制的重点是( )。",[62,64,66,67],{"key":20,"text":63,"correct":26},"工程价款支付控制",{"key":24,"text":65,"correct":22},"竣工财务决算控制",{"key":28,"text":57,"correct":22},{"key":31,"text":51,"correct":22},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":24,"analysis":33},953253,"建设项目内部审计的特点不包括( )。",[72,74,76,78],{"key":20,"text":73,"correct":22},"服务的内向性",{"key":24,"text":75,"correct":26},"审查机构的专业性",{"key":28,"text":77,"correct":22},"审查范围的广泛性",{"key":31,"text":79,"correct":22},"审查的及时性",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":31,"analysis":33},953254,"下列与建设项目内部审计的要求不相符的是( )。",[84,86,88,90],{"key":20,"text":85,"correct":22},"内部审计应独立、客观地审查和评价项目建设管理活动和内部控制",{"key":24,"text":87,"correct":22},"内部审计人员应当以职业谨慎态度执行审计业务",{"key":28,"text":89,"correct":22},"建设单位应按照相关的法律和行政法规规定，设立内部审计机构",{"key":31,"text":91,"correct":26},"被审计单位的管理活动和内部控制的决策和执行应由审计机构和内部相关人员负责",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},953255,"建设项目内部审计是( )的融合。",[96,98,100,102],{"key":20,"text":97,"correct":26},"财务审计和管理审计",{"key":24,"text":99,"correct":22},"国家审计和社会审计",{"key":28,"text":101,"correct":22},"专项审计和社会审计",{"key":31,"text":103,"correct":22},"国家审计和管理审计",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":28,"analysis":33},953256,"下列关于建设项目内部控制特点的表述，错误的是( )。",[108,110,112,114],{"key":20,"text":109,"correct":22},"建设项目内部控制是为达成项目总体目标而实施的控制，有明确的目的性",{"key":24,"text":111,"correct":22},"建设项目内部控制是实现既定目标过程中的控制，是一种动态过程，是手段而非目的",{"key":28,"text":113,"correct":26},"建设项目内部控制的实施，不受内部和外部环境的影响",{"key":31,"text":115,"correct":22},"建设项目内部控制是项目建设管理的重要组成部分，贯穿于项目建设的全过程",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},953257,"在项目财务内部控制机制中，( )是内部控制的制衡原则在项目财务管理方面的具体运用。",[120,122,124,126],{"key":20,"text":121,"correct":22},"组织控制",{"key":24,"text":123,"correct":22},"核算控制",{"key":28,"text":125,"correct":26},"制约监督机制",{"key":31,"text":127,"correct":22},"授权批准机制",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},953258,"建设项目内部控制的基本任务不包括( )。",[132,134,136,138],{"key":20,"text":133,"correct":22},"制定项目建设的目标与计划",{"key":24,"text":135,"correct":26},"构建科学的管理体系",{"key":28,"text":137,"correct":22},"明确项目组织的职责划分和权限",{"key":31,"text":139,"correct":22},"制定内部控制政策与程序",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},953259,"下列不属于建设项目内部控制基本要素的是( )。",[144,146,148,150],{"key":20,"text":145,"correct":26},"外部环境",{"key":24,"text":147,"correct":22},"风险评估",{"key":28,"text":149,"correct":22},"信息与沟通",{"key":31,"text":151,"correct":22},"内部监督",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},953260,"在建设项目内部审计方式中，( )的实施时间较长、审计项目和审计事项涉及多个方面。",[156,158,160,162],{"key":20,"text":157,"correct":22},"跟踪审计",{"key":24,"text":159,"correct":26},"专项审计",{"key":28,"text":161,"correct":22},"绩效审计",{"key":31,"text":163,"correct":22},"风险管理审计",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},953261,"内部控制审计，是针对内部控制制度和工作程序的健全性、有效性和适当性进行的审查与评价，其主要目的是( )。",[168,170,172,174],{"key":20,"text":169,"correct":26},"推进建设项目管理的制度化、规范化",{"key":24,"text":171,"correct":22},"提高建设项目经济效益",{"key":28,"text":173,"correct":22},"促进建设项目总体目标的实现",{"key":31,"text":175,"correct":22},"将处理风险的成本降到最低",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},953262,"下列不属于建设项目内部审计依据的是( )。",[180,182,184,186],{"key":20,"text":181,"correct":22},"项目建设相关的标准和规范",{"key":24,"text":183,"correct":22},"建设项目内部的工作制度和管理程序",{"key":28,"text":185,"correct":26},"竣工资料",{"key":31,"text":187,"correct":22},"相关的法律、法规和方针政策",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},953263,"竣工验收审计应采用( )，设计图与竣工图循环审查法，通过分析两者的差异来分析评价相关变更、签证的真实性与合法性。",[192,194,196,198],{"key":20,"text":193,"correct":22},"观察询问法",{"key":24,"text":195,"correct":22},"分析复核法",{"key":28,"text":197,"correct":22},"假设问题求证法",{"key":31,"text":199,"correct":26},"现场检查法",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},953264,"单机无负荷试车调试的条件不包括( )。",[204,206,208,210],{"key":20,"text":205,"correct":22},"试车范围内的工程已按设计内容和质量标准完成，资料齐全",{"key":24,"text":207,"correct":22},"单机试车方案已报经批准",{"key":28,"text":209,"correct":22},"测试仪表、工具、记录表格齐备，维护人员就位",{"key":31,"text":211,"correct":26},"试车方案中规定的工艺指标已确认并下达",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},953265,"项目试车调试不包括( )。",[216,218,220,222],{"key":20,"text":217,"correct":22},"单机无负荷试车调试",{"key":24,"text":219,"correct":26},"单机有负荷试车调试",{"key":28,"text":221,"correct":22},"联动无负荷试车调试",{"key":31,"text":223,"correct":22},"联动有负荷试车调试",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},953266,"试生产考核的目的是( )。",[228,230,232,234],{"key":20,"text":229,"correct":26},"在满负荷运行状况下，考核生产工艺流程、指标参数是否能够保持稳定、连续、长周期运行",{"key":24,"text":231,"correct":22},"打通生产工艺流程、稳定生产运行状态",{"key":28,"text":233,"correct":22},"完善自控仪表控制系统",{"key":31,"text":235,"correct":22},"达到设计生产指标的最终目标",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},953267,"生产准备机构应在( )适时组建。",[240,242,244,246],{"key":20,"text":241,"correct":22},"项目实施阶段的前期",{"key":24,"text":243,"correct":22},"项目决策阶段的前期",{"key":28,"text":245,"correct":26},"项目实施阶段的中、后期",{"key":31,"text":247,"correct":22},"项目决策阶段的后期",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},953268,"下列不属于联动有负荷试车调试目的的是( )。",[252,254,256,258],{"key":20,"text":253,"correct":22},"检验所有岗位人员与组织，在协调、控制、操作、故障应急处理等方面的反应能力",{"key":24,"text":255,"correct":22},"检验和考核整个生产工艺流程能否打通、全生产线设备运转状况、自控仪表与联锁系统控制效果，能否生产出合格产品",{"key":28,"text":257,"correct":26},"核验考核各岗位员工对系统试车的适应性",{"key":31,"text":259,"correct":22},"考核、规范工艺状态，确保下阶段试车的连续稳定",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":28,"analysis":33},953269,"单机无负荷试车调试应在调试前( )h将调试内容、时间、地点通知项目业主代表。",[264,266,268,270],{"key":20,"text":265,"correct":22},"12",{"key":24,"text":267,"correct":22},"24",{"key":28,"text":269,"correct":26},"48",{"key":31,"text":271,"correct":22},"72",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":28,"analysis":33},953270,"项目生产准备的目的不包括( )。",[276,278,280,282],{"key":20,"text":277,"correct":22},"使工程项目建成后能够及时完成试车调试",{"key":24,"text":279,"correct":22},"形成完整的生产能力",{"key":28,"text":281,"correct":26},"保证建设项目从生产运营阶段转入投产使用阶段",{"key":31,"text":283,"correct":22},"使投资发挥效益",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},953271,"单机无负荷试车调试应由( )组织。",[288,290,292,294],{"key":20,"text":289,"correct":26},"施工单位",{"key":24,"text":291,"correct":22},"建设单位",{"key":28,"text":293,"correct":22},"监理单位",{"key":31,"text":295,"correct":22},"设计单位",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},953272,"下列关于物资准备时机的表述，错误的是( )。",[300,302,304,306],{"key":20,"text":301,"correct":22},"建设项目所需物资应在建设项目竣工验收前落实供应渠道",{"key":24,"text":303,"correct":22},"应在建设项目竣工验收前签订供货合同",{"key":28,"text":305,"correct":26},"在项目建设前期，应根据物资的数量、规格以及品种特点和要求，分期分批组织进货，为投产试运行做好物质准备",{"key":31,"text":307,"correct":22},"大宗原料、燃料、材料的供货来源应在项目建设前期确定",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},953273,"项目实施准备阶段的生产准备不包括( )。",[312,314,316,318],{"key":20,"text":313,"correct":22},"参与合同谈判",{"key":24,"text":315,"correct":22},"参与招标文件的编制和审定",{"key":28,"text":317,"correct":22},"参与工程设计管理",{"key":31,"text":319,"correct":26},"建立新产品研发机构",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},953274,"在项目实施过程中，( )是一项十分重要的生产准备工作，是落实全部生产准备工作的基础。",[324,326,328,330],{"key":20,"text":325,"correct":22},"生产技术准备",{"key":24,"text":327,"correct":26},"生产人员准备",{"key":28,"text":329,"correct":22},"生产物资准备",{"key":31,"text":331,"correct":22},"外部协作条件准备",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},953275,"下列不属于人员培训原则的是( )。",[336,338,340,342],{"key":20,"text":337,"correct":22},"坚持实用、高效的原则",{"key":24,"text":339,"correct":22},"坚持经济、方便的原则",{"key":28,"text":341,"correct":22},"坚持理论学习与实际操作相结合的原则",{"key":31,"text":343,"correct":26},"坚持国内培训与国外培训相结合、以国外同类企业培训为主的原则",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},953276,"人员培训的方式不包括( )。",[348,350,352,354],{"key":20,"text":349,"correct":22},"集中培训",{"key":24,"text":351,"correct":22},"分类培训",{"key":28,"text":353,"correct":26},"重点培训",{"key":31,"text":355,"correct":22},"委托培训",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},953277,"下列关于建设项目竣工验收范围的表述，错误的是( )。",[360,362,364,366],{"key":20,"text":361,"correct":22},"凡新建、扩建、改建的基本建设项目，符合设计文件所规定的内容及验收标准的应及时组织验收",{"key":24,"text":363,"correct":26},"对于因少数主要设备短期内不能解决，虽然工程内容尚未全部完成，但可以投产或使用的工程项目应组织竣工验收",{"key":28,"text":365,"correct":22},"按规定内容已经建设完成，但因外部条件制约，而不能投入使用的项目可以进行竣工验收",{"key":31,"text":367,"correct":22},"对于已经形成部分生产能力，但近期内不能按原设计规模续建的项目，在报主管部门批准后，可以缩小规模，对已完成的工程和设备，应组织竣工验收",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},953278,"建设项目竣工验收的依据不包括( )。",[372,374,376,378],{"key":20,"text":373,"correct":22},"设备技术资料",{"key":24,"text":375,"correct":26},"监理大纲",{"key":28,"text":377,"correct":22},"工程设计文件",{"key":31,"text":379,"correct":22},"招标文件及合同文件",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},953279,"承包工程合同范围内的遗留尾工，应由( )。",[384,386,388,390],{"key":20,"text":385,"correct":26},"承包商在限定时间内扫尾完成",{"key":24,"text":387,"correct":22},"项目业主一次性划给生产单位包干实施",{"key":28,"text":389,"correct":22},"项目业主分期划给生产单位包干实施",{"key":31,"text":391,"correct":22},"后期工程一并组织实施",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},953280,"对于工程规模和技术复杂程度大的项目，为保证项目顺利通过正式验收，在验收准备工作基本就绪后，可由( )会同有关部门组成预验收组，进行一次预验。",[396,398,400,401],{"key":20,"text":397,"correct":26},"上级主管部门或项目业主",{"key":24,"text":399,"correct":22},"上级主管部门或监理单位",{"key":28,"text":293,"correct":22},{"key":31,"text":402,"correct":22},"项目业主或监理单位",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},953281,"对于中央企业公司投资为主的建设项目，应由( )主持工程竣工验收。",[407,409,411,413],{"key":20,"text":408,"correct":22},"国家投资主管部门",{"key":24,"text":410,"correct":22},"国家投资主管部门委托的地方投资主管部门",{"key":28,"text":412,"correct":26},"中央企业公司会同各投资方",{"key":31,"text":414,"correct":22},"地方投资主管部门",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},953282,"建设项目竣工验收的作用不包括( )。",[419,421,423,425],{"key":20,"text":420,"correct":22},"促进建设项目及时投产，尽快发挥投资效益",{"key":24,"text":422,"correct":22},"明确合同责任，及时结算",{"key":28,"text":424,"correct":22},"总结建设项目管理经验与教训",{"key":31,"text":426,"correct":26},"为有关部门与行业制定、调整相关政策起参谋作用",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},953283,"建设项目竣工验收主要是( )的任务。",[431,433,435,436],{"key":20,"text":432,"correct":22},"施工方",{"key":24,"text":434,"correct":26},"项目业主",{"key":28,"text":293,"correct":22},{"key":31,"text":437,"correct":22},"勘察、设计单位",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},953284,"建设工程预验工作的主要内容不包括( )。",[442,444,446,448],{"key":20,"text":443,"correct":22},"检查财务账表是否齐全，数据是否真实，开支是否合理",{"key":24,"text":445,"correct":22},"排除正式验收中可能有争议的问题，协调项目与有关方面、部门的关系",{"key":28,"text":447,"correct":26},"召开竣工验收会议",{"key":31,"text":449,"correct":22},"检查项目建设标准，评定质量，对隐患和遗留问题提出处理意见",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},953285,"竣工档案来自于工程文档资料，是在工程文档资料基础上随着( )同步进行收集、整理、审查、分类形成的。",[454,456,458,460],{"key":20,"text":455,"correct":26},"单项工程验收、全面竣工验收",{"key":24,"text":457,"correct":22},"工程建设的进度",{"key":28,"text":459,"correct":22},"环境和条件的变化",{"key":31,"text":461,"correct":22},"中间验收、全面竣工验收",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},953286,"下列不属于工程文档资料管理目的的是( )。",[466,468,470,472],{"key":20,"text":467,"correct":22},"为以后编制竣工档案奠定基础",{"key":24,"text":469,"correct":26},"真实、准确地反应建设项目实际情况",{"key":28,"text":471,"correct":22},"在项目实施期间提供便利的查阅条件",{"key":31,"text":473,"correct":22},"准确有效地为项目正常生产服务",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},953287,"项目后评价的基础是( )。",[478,480,482,484],{"key":20,"text":479,"correct":26},"项目建设全过程的回顾与评价",{"key":24,"text":481,"correct":22},"项目绩效与影响评价",{"key":28,"text":483,"correct":22},"项目目标实现程度和可持续性能力评价",{"key":31,"text":485,"correct":22},"项目建设主要经验与教训",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},953288,"在项目后评价的实施过程中，签订委托合同，搜集项目资料后应当( )。",[490,492,494,496],{"key":20,"text":491,"correct":26},"明确项目经理，筹组后评价组",{"key":24,"text":493,"correct":22},"聘请相关专家，明确任务分工",{"key":28,"text":495,"correct":22},"制定工作计划，设计调查方案",{"key":31,"text":497,"correct":22},"开展现场调查，听取各方反映",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},953289,"下列选项中，( )是项目后评价常用的方法，也是最实用、有效的方法。",[502,503,504,506],{"key":20,"text":193,"correct":22},{"key":24,"text":195,"correct":22},{"key":28,"text":505,"correct":22},"对比法",{"key":31,"text":507,"correct":26},"调查法",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":28,"analysis":33},953290,"下列关于建设项目后评价的表述，错误的是( )。",[512,514,516,518],{"key":20,"text":513,"correct":22},"建设项目后评价在我国大致经历了初步探索、逐步推进、全面实施三个发展阶段",{"key":24,"text":515,"correct":22},"建设项目后评价对促进建设项目管理、提高投资效益起到积极作用",{"key":28,"text":517,"correct":26},"项目后评价是对项目建设某一阶段的工作成效进行系统的回顾和总结",{"key":31,"text":519,"correct":22},"按照不同的评价时点，项目后评价可分为项目中间评价和项目综合后评价",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},953291,"在项目成功度测评等级中，基本成功是指( )。",[524,526,528,530],{"key":20,"text":525,"correct":22},"项目原定目标部分实现，项目功能有缺陷，效益和影响只有部分实现",{"key":24,"text":527,"correct":22},"项目原定目标实现非常少，项目功能有问题，效益和影响很差",{"key":28,"text":529,"correct":26},"项目原定目标大部分实现，项目功能、效益和影响基本达到预期要求",{"key":31,"text":531,"correct":22},"项目原定目标全面实现或超过预期，项目功能、效益和影响充分发挥",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},953292,"下列选项中，( )是项目后评价的核心内容。",[536,537,539,540],{"key":20,"text":483,"correct":22},{"key":24,"text":538,"correct":26},"项目绩效和影响评价",{"key":28,"text":485,"correct":22},{"key":31,"text":479,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},953293,"项目建设主要经验与教训应从( )四个层面分别进行分析。",[545,547,549,551],{"key":20,"text":546,"correct":26},"项目、企业、行业、宏观",{"key":24,"text":548,"correct":22},"投入、产出、直接目的、宏观影响",{"key":28,"text":550,"correct":22},"项目、企业、直接目的、宏观影响",{"key":31,"text":552,"correct":22},"投入、产出、行业、宏观影响",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},953294,"建设项目中间评价应以( )为着眼点。",[557,559,561,563],{"key":20,"text":558,"correct":26},"工程项目实施过程中出现的变化因素",{"key":24,"text":560,"correct":22},"项目的投资效益",{"key":28,"text":562,"correct":22},"工程实施过程中的变化因素对项目预期目标的影响",{"key":31,"text":564,"correct":22},"建设实施效果以及生产运营状况",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},953295,"社会影响评价的方法一般是( )，在诸要素分析评价的基础上做综合评价。",[569,571,573,575],{"key":20,"text":570,"correct":26},"定性和定量相结合，以定性为主",{"key":24,"text":572,"correct":22},"定性和定量相结合，以定量为主",{"key":28,"text":574,"correct":22},"定量和定期相结合，以定量为主",{"key":31,"text":576,"correct":22},"定量和定期相结合，以定期为主",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":28,"analysis":33},953296,"后评价项目的选取范围不包括( )。",[581,583,585,587],{"key":20,"text":582,"correct":22},"重大型项目",{"key":24,"text":584,"correct":22},"复杂型项目",{"key":28,"text":586,"correct":26},"利用外国政府及其机构贷款的建设项目",{"key":31,"text":588,"correct":22},"企业或行业内有代表性的项目",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},953297,"规划区的建设项目，建设单位应当在项目竣工验收后( )内，向规划行使主管部门报送建设项目竣工资料。",[593,595,597,599],{"key":20,"text":594,"correct":22},"1个月.",{"key":24,"text":596,"correct":22},"3个月",{"key":28,"text":598,"correct":22},"5个月",{"key":31,"text":600,"correct":26},"6个月",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":31,"analysis":33},953298,"关于工程设计管理方式的表述中，错误的是( )。",[605,607,609,611],{"key":20,"text":606,"correct":22},"建设单位直接管理要求建设单位要有很强的专业技术力量和较高的设计管理水平，具有设计评审经验和判断能力",{"key":24,"text":608,"correct":22},"委托咨询公司设计管理要求专业咨询公司对工程设计单位必须具有独立性",{"key":28,"text":610,"correct":22},"委托项目管理公司管理时，项目管理公司管理承担受委托管理范围的责任，但属于非决策机构",{"key":31,"text":612,"correct":26},"委托项目管理公司管理时，重大方案由建设单位和项目管理公司共同决策",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]