[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-690-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":588},{"id":5,"name":6,"category":7,"favorite":8},690,"投资建设项目实施","建筑工程",0,4,50,433,[13,34,46,58,70,82,94,103,115,127,139,151,163,175,187,199,207,219,227,239,248,258,270,278,290,302,314,323,335,347,359,371,383,395,407,419,431,443,455,467,479,491,499,511,519,531,543,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},953199,1,"单选题","履约担保的担保金额一般不得低于合同价款的( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","10%",true,{"key":24,"text":25,"correct":26},"B","15%",false,{"key":28,"text":29,"correct":26},"C","20%",{"key":31,"text":32,"correct":26},"D","25%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},953200,"工程保险既承保投保人的财产损失风险，同时也承保投保人的责任风险，这体现了其承保风险的( )。",[38,40,42,44],{"key":20,"text":39,"correct":26},"广泛性",{"key":24,"text":41,"correct":26},"不确定性",{"key":28,"text":43,"correct":22},"特殊性",{"key":31,"text":45,"correct":26},"综合性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},953201,"议决投保程度，从本质上说，是风险转移与风险自留的结合。这种结合的方式不包括( )。",[50,52,54,56],{"key":20,"text":51,"correct":26},"不足额保险",{"key":24,"text":53,"correct":26},"自负额保险",{"key":28,"text":55,"correct":26},"限制损失保险",{"key":31,"text":57,"correct":22},"履约保证保险",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},953202,"投标保证担保的有效期应超出投标有效期至少( )D。",[62,64,66,68],{"key":20,"text":63,"correct":26},"10",{"key":24,"text":65,"correct":26},"15",{"key":28,"text":67,"correct":26},"20",{"key":31,"text":69,"correct":22},"28",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},953203,"下列选项中，( )是指引起损失的直接原因或外在的原因，是使风险造成损失的可能性转化为现实性的桥梁。",[74,76,78,80],{"key":20,"text":75,"correct":26},"风险因素",{"key":24,"text":77,"correct":22},"风险事件",{"key":28,"text":79,"correct":26},"风险损失",{"key":31,"text":81,"correct":26},"风险对策",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},953204,"从风险管理的角度，保险具有( )两种机制。",[86,88,90,92],{"key":20,"text":87,"correct":26},"风险回避与风险组合",{"key":24,"text":89,"correct":22},"风险转移与风险组合",{"key":28,"text":91,"correct":26},"风险转移与风险控制",{"key":31,"text":93,"correct":26},"风险转移与风险分散",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},953205,"在担保有效期内，因承包人不履行合同而导致其履约保函金额被业主索赔提取后，承包人应在( )日内向业主提交同等金额履约保函。",[98,99,100,101],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":26},{"key":31,"text":102,"correct":26},"30",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":28,"analysis":33},953206,"当发现某项活动的潜在威胁发生可能性很大，又无其他风险管理措施可用时，常采用( )。",[107,109,111,113],{"key":20,"text":108,"correct":26},"风险控制",{"key":24,"text":110,"correct":26},"风险转移",{"key":28,"text":112,"correct":22},"风险回避",{"key":31,"text":114,"correct":26},"风险分散",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":28,"analysis":33},953207,"下列关于工程保险的表述，错误的是( )。",[119,121,123,125],{"key":20,"text":120,"correct":26},"工程保险能够提供风险管理服务，减少风险损失的发生",{"key":24,"text":122,"correct":26},"保险人对补偿的方式可以选择",{"key":28,"text":124,"correct":22},"如果投保对其财产投保多张保险单，他获得的赔款数额可以超过他的财产总值",{"key":31,"text":126,"correct":26},"如果保险事故由第三者责任引起的，则投保人从保险人处获得全部补偿以后，必须将其对第三者享有的追偿有关损失的权利转让给保险人",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},953208,"下列关于风险因素的表述，错误的是( )。",[131,133,135,137],{"key":20,"text":132,"correct":26},"在满足一定条件的基础上将引起风险事故",{"key":24,"text":134,"correct":26},"风险因素是造成损失的潜在原因",{"key":28,"text":136,"correct":26},"风险因素是造成损失的间接原因",{"key":31,"text":138,"correct":22},"风险因素是事故发生的外在原因",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},953209,"风险转移的适用情形不包括( )。",[143,145,147,149],{"key":20,"text":144,"correct":26},"风险的转移方和被转移方之间的损失可以清楚地计算和划分",{"key":24,"text":146,"correct":22},"风险发生的概率相当高，且冒该风险得不偿失",{"key":28,"text":148,"correct":26},"风险转移的成本低于其他风险管理措施",{"key":31,"text":150,"correct":26},"被转移人能够且愿意承担适当的风险",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},953210,"工程风险是指建设项目实施过程中，因( )而引起的实际结果与预期结果的差异及可能性。",[155,157,159,161],{"key":20,"text":156,"correct":26},"外部条件的制约",{"key":24,"text":158,"correct":26},"决策的局限性",{"key":28,"text":160,"correct":22},"项目本身和环境条件的不确定性",{"key":31,"text":162,"correct":26},"工程变更",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},953211,"工程保险属于建设项目工程实施中的( )。",[167,169,171,173],{"key":20,"text":168,"correct":22},"财产保险",{"key":24,"text":170,"correct":26},"责任保险",{"key":28,"text":172,"correct":26},"信用保证保险",{"key":31,"text":174,"correct":26},"人数保险",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},953212,"下列不属于工程担保作用的是( )。",[179,181,183,185],{"key":20,"text":180,"correct":26},"规范工程承发包交易行为",{"key":24,"text":182,"correct":26},"保证参与工程各方的正当权益",{"key":28,"text":184,"correct":26},"防范和化解工程风险",{"key":31,"text":186,"correct":22},"补偿风险损失，保证工程顺利实施",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},953213,"投标保证担保的担保金额一般不超过投标总价的( )，且最高不得超过80万元人民币。",[191,193,195,197],{"key":20,"text":192,"correct":22},"2%",{"key":24,"text":194,"correct":26},"3%",{"key":28,"text":196,"correct":26},"4%",{"key":31,"text":198,"correct":26},"5%",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},953214,"业主工程款支付担保的担保金额应当与承包商履约担保的担保金额相等，不得低于合同价款的( )，且不得少于合同约定的分期付款的最高额度。",[203,204,205,206],{"key":20,"text":198,"correct":26},{"key":24,"text":21,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},953215,"对于工程建设合同额超过( )亿元人民币以上的工程，业主工程款支付担保可以按工程合同确定的付款周期实行分段滚动担保。",[211,213,215,217],{"key":20,"text":212,"correct":22},"1",{"key":24,"text":214,"correct":26},"2",{"key":28,"text":216,"correct":26},"3",{"key":31,"text":218,"correct":26},"5",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},953216,"就风险管理的一般意义而言，( )是处理风险最强有力的手段。",[223,224,225,226],{"key":20,"text":112,"correct":22},{"key":24,"text":108,"correct":26},{"key":28,"text":110,"correct":26},{"key":31,"text":114,"correct":26},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":31,"analysis":33},953217,"每一项工程并不是孤立进行的，在实施过程中，它需要业主、承包商、勘察、设计和监理等单位的共同合作，任何一个参与方的懈怠都可能造成建设项目实施的重大损失，这体现了( )。",[231,233,235,237],{"key":20,"text":232,"correct":26},"风险损失的严重性",{"key":24,"text":234,"correct":26},"风险事件的突发性",{"key":28,"text":236,"correct":26},"风险因素的大量性",{"key":31,"text":238,"correct":22},"风险防范的多元性",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":20,"analysis":33},953218,"招标人与中标人签订合同之日起( )个工作日内，应当退还未中标人的投标保证担保保函。",[243,244,245,246],{"key":20,"text":218,"correct":22},{"key":24,"text":63,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":247,"correct":26},"25",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},953219,"目前建筑用机器设备的免赔额为保险金额的( )。",[252,254,256,257],{"key":20,"text":253,"correct":26},"0.5%",{"key":24,"text":255,"correct":26},"1%",{"key":28,"text":192,"correct":26},{"key":31,"text":198,"correct":22},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},953220,"风险转移的途径不包括( )。",[262,264,266,268],{"key":20,"text":263,"correct":26},"合同",{"key":24,"text":265,"correct":26},"期货",{"key":28,"text":267,"correct":26},"工程担保",{"key":31,"text":269,"correct":22},"风险抑制",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},953221,"行为主体将自己不能承担或不愿承担的风险转嫁给其他经济单位承担的行为称为( )。",[274,275,276,277],{"key":20,"text":112,"correct":26},{"key":24,"text":114,"correct":26},{"key":28,"text":110,"correct":22},{"key":31,"text":108,"correct":26},{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":28,"analysis":33},953222,"下列关于风险控制的表述，错误的是( )。",[282,284,286,288],{"key":20,"text":283,"correct":26},"根据风险控制的目的，风险控制可以分为风险预防和风险抑制",{"key":24,"text":285,"correct":26},"风险控制从主动采取预防措施人手",{"key":28,"text":287,"correct":22},"风险控制是一种消极的风险管理措施，其选用具有很大的局限性",{"key":31,"text":289,"correct":26},"风险控制措施成本低、效益好，不会产生不良后遗症",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":31,"analysis":33},953223,"工程建设风险管理中首要的一步是( )。",[294,296,298,300],{"key":20,"text":295,"correct":26},"风险估计",{"key":24,"text":297,"correct":26},"风险评价",{"key":28,"text":299,"correct":26},"风险决策",{"key":31,"text":301,"correct":22},"风险识别",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},953224,"保证人承担保证责任的形式不包括( )。",[306,308,310,312],{"key":20,"text":307,"correct":26},"向招标人支付投标保证金",{"key":24,"text":309,"correct":22},"向承包商提供资金、设备或技术援助",{"key":28,"text":311,"correct":26},"如果招标人选择次低标中标，向招标人支付中标价与次低标价之间的差额",{"key":31,"text":313,"correct":26},"如果招标人选择重新招标，应向招标人支付重新招标的费用",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},953225,"在工程风险管理程序中，( )是对工程建设中的风险进行量化，据以确定风险大小，并为下一步确定风险的影响程度奠定基础。",[318,319,320,321],{"key":20,"text":295,"correct":22},{"key":24,"text":297,"correct":26},{"key":28,"text":299,"correct":26},{"key":31,"text":322,"correct":26},"风险处理",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},953226,"在风险类型中，( )是指由于个人或团体的行为对工程实施造成的损失可能。",[327,329,331,333],{"key":20,"text":328,"correct":26},"人身损失风险",{"key":24,"text":330,"correct":22},"社会风险",{"key":28,"text":332,"correct":26},"政治风险",{"key":31,"text":334,"correct":26},"责任损失风险",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},953227,"在银行贷款的偿还方式中，分期付息到期还本的优点主要表现在( )。",[339,341,343,345],{"key":20,"text":340,"correct":26},"借贷双方风险较小",{"key":24,"text":342,"correct":26},"便利快捷",{"key":28,"text":344,"correct":26},"借款到期日的偿债压力小",{"key":31,"text":346,"correct":22},"有利于保证生产经营的需要",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},953228,"加强建设项目资本金的筹措和管理是建设项目筹资管理的( )。",[351,353,355,357],{"key":20,"text":352,"correct":26},"基本保障",{"key":24,"text":354,"correct":22},"首要任务",{"key":28,"text":356,"correct":26},"前提条件",{"key":31,"text":358,"correct":26},"核心内容",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":28,"analysis":33},953229,"验资是对建设项目投资者投入的资本进行法律确认，它包括( )两项内容。",[363,365,367,369],{"key":20,"text":364,"correct":26},"价值确认和形式确认",{"key":24,"text":366,"correct":26},"程序确认和时间确认",{"key":28,"text":368,"correct":22},"价值确认和时间确认",{"key":31,"text":370,"correct":26},"时间确认和形式确认",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},953230,"在银行贷款的偿还方式中，分期还本付息的基本特征是( )。",[375,377,379,381],{"key":20,"text":376,"correct":26},"在整个借款期内，按某一相等金额偿付借款本金和利息",{"key":24,"text":378,"correct":22},"分期等额偿还本金，对未还本金则按期支付利息",{"key":28,"text":380,"correct":26},"按约定时间支付借款利息",{"key":31,"text":382,"correct":26},"借款到期后一次偿还本金",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},953231,"下列不属于融资租赁程序的是( )。",[387,389,391,393],{"key":20,"text":388,"correct":26},"挑选租赁公司，办理租赁委托",{"key":24,"text":390,"correct":22},"签订贷款合同",{"key":28,"text":392,"correct":26},"办理验货、付款与保险",{"key":31,"text":394,"correct":26},"支付租金",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},953232,"中期票据是具有法人资格的非金融企业在银行间债券市场按计划发行的、约定在( )还本付息的债务融资工具。",[399,401,403,405],{"key":20,"text":400,"correct":26},"1年内",{"key":24,"text":402,"correct":26},"2年",{"key":28,"text":404,"correct":26},"3年内",{"key":31,"text":406,"correct":22},"一定期限",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},953233,"对于( )的工程，发包方对工程质量有异议的，其质量争议按工程保修合同执行。",[411,413,415,417],{"key":20,"text":412,"correct":22},"竣工未验收但已实际投入使用",{"key":24,"text":414,"correct":26},"停工、停建",{"key":28,"text":416,"correct":26},"已竣工验收未实际投入使用",{"key":31,"text":418,"correct":26},"未竣工验收",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},953234,"下列关于项目资本金验资的表述，错误的是( )。",[423,425,427,429],{"key":20,"text":424,"correct":26},"项目资本金以货币资金出资的，应按照建设项目开户银行实际收到的资金和日期作为投资者投入资本的入账依据",{"key":24,"text":426,"correct":26},"项目资本金以实物或无形资产作为出资的，应按照投资协议或合同确定的价值作为投资者出资入账的价值",{"key":28,"text":428,"correct":22},"项目资本金以实物出资的应以实物转移的时间作为出资入账的时间",{"key":31,"text":430,"correct":26},"项目资本金以无形资产作为项目资本金出资的，应在投资协议或合同中确定其价值并规定完成有关手续的时间确认为出资入账时间",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},953235,"下列关于建设项目资本金的表述，错误的是( )。",[435,437,439,441],{"key":20,"text":436,"correct":26},"建设项目资本金是投资者在建设项目总投资中认缴的出资总额",{"key":24,"text":438,"correct":26},"建设项目资本金是非债务资金",{"key":28,"text":440,"correct":26},"建设项目资本金的投资者可按出资额的比例依法享有所有者权益",{"key":31,"text":442,"correct":22},"建设项目资本金的投资者无权转让、抽回其出资",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},953236,"国家对各类外债和或有外债实行( )。",[447,449,451,453],{"key":20,"text":448,"correct":26},"集体决策审批制度",{"key":24,"text":450,"correct":22},"全口径管理",{"key":28,"text":452,"correct":26},"部门责任制度",{"key":31,"text":454,"correct":26},"分级管理",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":28,"analysis":33},953237,"国际金融组织贷款和外国政府贷款是由中国政府举借的中长期优惠贷款，重点用于( )。",[459,461,463,465],{"key":20,"text":460,"correct":26},"引进先进技术或设备",{"key":24,"text":462,"correct":26},"产业结构调整",{"key":28,"text":464,"correct":22},"基础性和公益性建设项目",{"key":31,"text":466,"correct":26},"外债结构调整",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":28,"analysis":33},953238,"下列选项中，( )是编制融资计划的前提，是财务决策的基本依据。",[471,473,475,477],{"key":20,"text":472,"correct":26},"财务决策",{"key":24,"text":474,"correct":26},"财务预算",{"key":28,"text":476,"correct":22},"财务预测",{"key":31,"text":478,"correct":26},"财务分析",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},953239,"财务分析包括( )。",[483,485,487,489],{"key":20,"text":484,"correct":22},"常用财务指标分析和综合财务分析",{"key":24,"text":486,"correct":26},"融资成本分析和融资风险分析",{"key":28,"text":488,"correct":26},"财务预算分析和财务决算分析",{"key":31,"text":490,"correct":26},"盈利性分析和风险性分析",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":28,"analysis":33},953240,"建设项目应当自签订对外借款合同( )个工作日内，凭对外借款合同和项目批准文件到外汇管理部门办理外债登记。",[495,496,497,498],{"key":20,"text":218,"correct":26},{"key":24,"text":63,"correct":26},{"key":28,"text":65,"correct":22},{"key":31,"text":67,"correct":26},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},953241,"反映建设单位月份或年度终了时全部资金来源和资金占用的情况的是( )。",[503,505,507,509],{"key":20,"text":504,"correct":26},"基建投资表",{"key":24,"text":506,"correct":26},"待摊投资明细表",{"key":28,"text":508,"correct":26},"基建借款情况表",{"key":31,"text":510,"correct":22},"资金平衡表",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},953242,"尾工工程超过项目投资总概算( )的，不能编制建设项目竣工财务决算。",[515,516,517,518],{"key":20,"text":198,"correct":22},{"key":24,"text":21,"correct":26},{"key":28,"text":25,"correct":26},{"key":31,"text":29,"correct":26},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},953243,"对于资金需求量大、偿债能力较强的大型建设项目，可申请( )。",[523,525,527,529],{"key":20,"text":524,"correct":22},"银团贷款",{"key":24,"text":526,"correct":26},"委托贷款",{"key":28,"text":528,"correct":26},"融资租赁",{"key":31,"text":530,"correct":26},"债权融资",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":31,"analysis":33},953244,"建设项目财务管理应遵循的原则不包括( )。",[535,537,539,541],{"key":20,"text":536,"correct":26},"强化建设项目财务预算管理",{"key":24,"text":538,"correct":26},"实行经济核算，落实经济责任制",{"key":28,"text":540,"correct":26},"坚持建设项目法人责任制和建设项目资金本制",{"key":31,"text":542,"correct":22},"认真分析工程变更并作出慎重决策",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":20,"analysis":33},953245,"对列入房屋、建筑物等建筑工程预算的附属设备，出库安装时，( )。",[547,549,551,553],{"key":20,"text":548,"correct":22},"不能计入设备投资支出",{"key":24,"text":550,"correct":26},"直接计入设备投资支出",{"key":28,"text":552,"correct":26},"需具备一定条件后才能计入设备投资支出",{"key":31,"text":554,"correct":26},"直接计入待摊投资支出",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":28,"analysis":33},953246,"资金筹措计划应根据( )编制。",[559,561,563,565],{"key":20,"text":560,"correct":26},"初步设计概算和施工图预算",{"key":24,"text":562,"correct":26},"融资方案和建设项目工期计划",{"key":28,"text":564,"correct":22},"融资方案和建设项目资金投入计划",{"key":31,"text":566,"correct":26},"初步设计概算和建设项目资金投入计划",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},953247,"对于( )竣工财务决算的报批，由各省、自治区、直辖市、计划单列市财政厅(局)确定。",[571,573,575,577],{"key":20,"text":572,"correct":26},"中央级小型项目",{"key":24,"text":574,"correct":22},"地方级建设项目",{"key":28,"text":576,"correct":26},"属国家确定的重点项目",{"key":31,"text":578,"correct":26},"中央级大中型",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":31,"analysis":33},953248,"建设项目管理负责人，在现实条件下为实现建设项目财务预定目标，在拟定多种可行性方案的基础上，择优选择最合理有效的行动方案的过程称为( )。",[583,585,586,587],{"key":20,"text":584,"correct":26},"财务控制",{"key":24,"text":478,"correct":26},{"key":28,"text":476,"correct":26},{"key":31,"text":472,"correct":22},[589,592,595,598,601,604],{"id":15,"name":590,"category":7,"favorite":591},"领导干部任职前廉政法规知识测试题",92,{"id":593,"name":594,"category":7,"favorite":15},595,"建筑结构与设备",{"id":596,"name":597,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":599,"name":600,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":602,"name":603,"category":7,"favorite":8},534,"BIM工程师",{"id":605,"name":603,"category":7,"favorite":8},535]