[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-690-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},690,"投资建设项目实施","建筑工程",0,3,50,433,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,234,246,258,270,282,294,306,318,330,342,354,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,545,557,567,579,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},953149,1,"单选题","考核安全控制和管理工作的依据是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","安全应急预案",false,{"key":24,"text":25,"correct":26},"B","安全计划",true,{"key":28,"text":29,"correct":22},"C","安全检查记录",{"key":31,"text":32,"correct":22},"D","安全检查报告","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},953150,"安全技术交底的内容不包括( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"本工程项目的施工作业特点和危险点",{"key":24,"text":41,"correct":22},"针对危险点的具体预防措施",{"key":28,"text":43,"correct":26},"安全管理组织机构的形式和组成",{"key":31,"text":45,"correct":22},"发生事故后应及时采取的避难和急救措施",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},953151,"下列不属于设计单位环境管理责任的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"根据设计任务书及环境影响评价的要求，在设计文件中编制环境保护篇章",{"key":24,"text":53,"correct":22},"提出施工过程中的环境保护措施和要点",{"key":28,"text":55,"correct":26},"按照有关环境保护和文明施工的要求组织施工",{"key":31,"text":57,"correct":22},"参与三同时项目的过程检查和验收并签署意见",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},953152,"安全生产的基本方针是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"切合实际，经济合理",{"key":24,"text":65,"correct":26},"安全第一，预防为主",{"key":28,"text":67,"correct":22},"安全可靠，质量第一",{"key":31,"text":69,"correct":22},"安全适用，技术先进",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},953153,"下列关于安全计划的表述，错误的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"安全计划是根据项目特点进行安全策划最终形成的文件",{"key":24,"text":77,"correct":22},"安全计划包括规划安全作业目标",{"key":28,"text":79,"correct":22},"安全计划应在项目开始实施前制定",{"key":31,"text":81,"correct":26},"安全计划只可在项目实施前进行调整，在实施过程中不得做任何改变",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},953154,"下列不属于现场文明施工基本要求的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"有整套的施工组织设计或施工方案",{"key":24,"text":89,"correct":26},"建立项目环境自我监控体系",{"key":28,"text":91,"correct":22},"有严格的成品保护措施和制度，大小临时设施和各种材料、构件、半成品按平面布置堆放整齐",{"key":31,"text":93,"correct":22},"施工场地平整，道路畅通，排水设施得当，水电线路整齐，机具设备状况良好，使用合理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},953155,"施工单位应对达到一定规模的危险性较大的分部分项工程编制( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"安全技术措施",{"key":24,"text":101,"correct":26},"专项施工方案",{"key":28,"text":103,"correct":22},"施工现场临时用电方案",{"key":31,"text":105,"correct":22},"工程变更方案",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},953156,"下列不属于安全事故处理原则的是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"事故原因未查明不放过",{"key":24,"text":113,"correct":26},"事故处理不及时不放过",{"key":28,"text":115,"correct":22},"事故责任者和员工未受到教育不放过",{"key":31,"text":117,"correct":22},"整改措施未落实不放过",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},953157,"建设项目两类危险源中，第二类危险源是( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"可能发生意外释放能量的载体或物质",{"key":24,"text":125,"correct":22},"事故发生的主体",{"key":28,"text":127,"correct":26},"导致事故的必要条件",{"key":31,"text":129,"correct":22},"决定事故后果的严重程度",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},953158,"项目建设的各参与方、各专业、各工种都要纳入建设项目职业健康安全和环境管理体系，这体现了职业健康安全和环境管理的( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"全过程管理",{"key":24,"text":137,"correct":22},"全行业管理",{"key":28,"text":139,"correct":22},"全社会管理",{"key":31,"text":141,"correct":26},"全面管理",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},953159,"建设单位环境管理的责任总体是在( )阶段进行环境影响评价、在实施阶段按照\"三同时\"要求落实环境管理措施并保证资金投入。",[146,148,150,152],{"key":20,"text":147,"correct":22},"竣工验收",{"key":24,"text":149,"correct":26},"决策",{"key":28,"text":151,"correct":22},"投产使用",{"key":31,"text":153,"correct":22},"保修",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},953160,"工程监理单位在实施监理过程中，发现存在安全事故隐患的，应当( )。",[158,160,162,164],{"key":20,"text":159,"correct":26},"要求施工单位整改",{"key":24,"text":161,"correct":22},"要求施工单位暂停施工",{"key":28,"text":163,"correct":22},"报告建设单位",{"key":31,"text":165,"correct":22},"向有关政府主管部门报告",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},953161,"在落实职业健康安全与环境管理方针的手段中，( )的主要目的是降低或消除设备、材料带来的不利于职业健康安全风险。",[170,172,174,176],{"key":20,"text":171,"correct":26},"技术管理",{"key":24,"text":173,"correct":22},"改善环境",{"key":28,"text":175,"correct":22},"资金管理",{"key":31,"text":177,"correct":22},"绩效审计",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},953162,"项目实施的组织者和主导方是( )。",[182,184,186,188],{"key":20,"text":183,"correct":26},"建设单位",{"key":24,"text":185,"correct":22},"施工单位",{"key":28,"text":187,"correct":22},"设计单位",{"key":31,"text":189,"correct":22},"监理单位",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},953163,"对于中度风险而言其控制策略是( )。",[194,196,198,200],{"key":20,"text":195,"correct":22},"当风险降低后才可继续工作",{"key":24,"text":197,"correct":26},"在规定期限内实施降低风险的措施",{"key":28,"text":199,"correct":22},"不增加额外控制措施但需进行监视",{"key":31,"text":201,"correct":22},"采取应急措施，保证大量资源投入",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},953164,"对于( )事故而言，其事故调查组应由企业主管部门会同企业所在地区的行政安全部门、公安部门、工会组成。",[206,208,210,212],{"key":20,"text":207,"correct":22},"轻伤",{"key":24,"text":209,"correct":22},"重伤",{"key":28,"text":211,"correct":26},"伤亡",{"key":31,"text":213,"correct":22},"重大死亡",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},953165,"死亡和重大死亡事故调查组应邀请( )和有关专业技术人员参加。",[218,220,222,224],{"key":20,"text":219,"correct":22},"人民法院",{"key":24,"text":221,"correct":26},"人民检察院",{"key":28,"text":223,"correct":22},"生产技术部门",{"key":31,"text":225,"correct":22},"与事故有直接利害关系的人员",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},953166,"建设项目环境管理贯穿项目建设全过程，因此，建设项目环境管理体系是在( )的主导下，其他各参建单位在其职责范围内履行环境管理职责。",[230,231,232,233],{"key":20,"text":183,"correct":26},{"key":24,"text":189,"correct":22},{"key":28,"text":185,"correct":22},{"key":31,"text":187,"correct":22},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},953167,"环境保护的第一责任人是( )。",[238,240,242,244],{"key":20,"text":239,"correct":22},"作业队长",{"key":24,"text":241,"correct":22},"班组长",{"key":28,"text":243,"correct":22},"操作工人",{"key":31,"text":245,"correct":26},"项目经理",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},953168,"下列不属于承包人对分包人的安全生产责任的是( )。",[250,252,254,256],{"key":20,"text":251,"correct":22},"在分包合同中明确分包人安全生产责任和义务",{"key":24,"text":253,"correct":26},"执行承包人的有关安全生产制度",{"key":28,"text":255,"correct":22},"统计上报分包人的伤亡事故并协助处理",{"key":31,"text":257,"correct":22},"审查分包人的安全资质",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},953169,"现场环境保护的意义不包括( )。.",[262,264,266,268],{"key":20,"text":263,"correct":22},"保护和改善项目环境是保护公众身体健康的需要",{"key":24,"text":265,"correct":22},"保护和改善项目环境是项目各参与方的责任和义务",{"key":28,"text":267,"correct":26},"保护和改善项目环境是提高经济效益的必要前提",{"key":31,"text":269,"correct":22},"保护和改善项目环境是保证员工安全高效生产、顺利实现项目目标的必要条件",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},953170,"下列不属于工程造价控制依据的是( )。",[274,276,278,280],{"key":20,"text":275,"correct":22},"工程设计图纸、设计说明及设计变更洽商",{"key":24,"text":277,"correct":22},"市场价格信息",{"key":28,"text":279,"correct":22},"分项、分部工程质量报验认可单",{"key":31,"text":281,"correct":26},"施工合同文件",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},953171,"下列不属于工程款竣工结算监理基本程序的是( )。",[286,288,290,292],{"key":20,"text":287,"correct":22},"工程承包单位按施工合同规定填报竣工结算报表",{"key":24,"text":289,"correct":26},"专业监理工程师进行现场计量",{"key":28,"text":291,"correct":22},"建设项目业主审核后向承包单位付款",{"key":31,"text":293,"correct":22},"总监理工程师审定竣工结算报表，与建设项目业主、工程承包单位协商一致后，签发竣工结算文件和最终的工程款支付证书，报建设项目业主",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":28,"analysis":33},953172,"对机电设备与工器具购置费、联合试运转费之和占工程概算投资额( )以上的工程项目，双方可协商确定监理费的计费方式和收费额。",[298,300,302,304],{"key":20,"text":299,"correct":22},"15%",{"key":24,"text":301,"correct":22},"20%",{"key":28,"text":303,"correct":26},"30%",{"key":31,"text":305,"correct":22},"35%",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},953173,"下列关于工程变更的表述，错误的是( )。",[310,312,314,316],{"key":20,"text":311,"correct":22},"在总监理工程师签发工程变更单之前，承包单位不得实施工程变更",{"key":24,"text":313,"correct":22},"未经总监理工程师审查同意而实施的工程变更，项目监理机构不得予以计量",{"key":28,"text":315,"correct":22},"在建设单位和承包单位未能就工程变更的费用等方面达成协议时，项目监理机构应提出一个暂定的价格，作为临时支付工程进度款的依据",{"key":31,"text":317,"correct":26},"总监理工程师应就工程变更的质量、费用与承包单位进行协商，无需取得建设单位授权",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},953174,"对于不符合设计要求及国家质量标准的材料设备，监理单位有权( )。",[322,324,326,328],{"key":20,"text":323,"correct":26},"通知承建商停止使用",{"key":24,"text":325,"correct":22},"通知承建商停工整改",{"key":28,"text":327,"correct":22},"向承建商提出建议",{"key":31,"text":329,"correct":22},"通知承建商返工",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},953175,"下列选项中，( )是完成国家法律法规、行业规范规定的施工阶段基本监理服务内容的酬金。",[334,336,338,340],{"key":20,"text":335,"correct":22},"施工监理收费基准价",{"key":24,"text":337,"correct":26},"施工监理收费基价",{"key":28,"text":339,"correct":22},"施工监理计费额",{"key":31,"text":341,"correct":22},"施工监理收费调整系数",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},953176,"对于工程结构设计和其他专业设计中的技术问题，监理单位应按照安全和优化的原则，( )。",[346,348,350,352],{"key":20,"text":347,"correct":22},"自主向设计单位提出建议，无需向业主提出书面报告",{"key":24,"text":349,"correct":26},"自主向设计单位提出建议，并向业主提出书面报告",{"key":28,"text":351,"correct":22},"事先取得业主同意，无需向业主提出书面报告",{"key":31,"text":353,"correct":22},"事先取得业主同意，并向业主提出书面报告",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},953177,"工程监理单位在实施监理过程中，发现存在安全事故隐患且情况严重的，应当( )。",[358,359,361,363],{"key":20,"text":159,"correct":22},{"key":24,"text":360,"correct":26},"要求施工单位暂时停止施工",{"key":28,"text":362,"correct":22},"及时向有关主管部门报告",{"key":31,"text":364,"correct":22},"建议撤换承包单位",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},953178,"因非监理单位原因，暂停或终止执行监理业务时的善后工作及恢复监理业务前的准备工作是( )。",[369,371,373,375],{"key":20,"text":370,"correct":22},"附加监理工作",{"key":24,"text":372,"correct":26},"额外监理工作",{"key":28,"text":374,"correct":22},"阶段性监理工作",{"key":31,"text":376,"correct":22},"全过程监理工作",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},953179,"建设工程监理与相关服务收费应根据建设项目投资额的不同情况，分别实行政府指导价和( )。",[381,383,385,387],{"key":20,"text":382,"correct":22},"政府定价",{"key":24,"text":384,"correct":22},"合同约定价",{"key":28,"text":386,"correct":26},"市场调节价",{"key":31,"text":388,"correct":22},"合同估算价",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},953180,"当影响工期事件具有( )时，项目监理机构可在收到承包单位提交的阶段性工程延期申请表并经过审查后，先由总监理工程师签署工程临时延期审批表并通报建设单位。",[393,395,397,399],{"key":20,"text":394,"correct":22},"阶段性",{"key":24,"text":396,"correct":26},"持续性",{"key":28,"text":398,"correct":22},"不确定性",{"key":31,"text":400,"correct":22},"特殊性",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},953181,"总监理工程师应根据暂停工程的( )，按照施工合同和委托监理合同的约定签发工程暂停令。",[405,407,409,411],{"key":20,"text":406,"correct":26},"影响范围和程度",{"key":24,"text":408,"correct":22},"持续时间和程度",{"key":28,"text":410,"correct":22},"影响事实和程度",{"key":31,"text":412,"correct":22},"影响原因和持续时间",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},953182,"改扩建和技术改造建设工程项目，其施工监理费附加调整系数应为( )。",[417,419,421,423],{"key":20,"text":418,"correct":22},"1.0～1.1",{"key":24,"text":420,"correct":26},"1.1～1.2",{"key":28,"text":422,"correct":22},"1.1～1.3",{"key":31,"text":424,"correct":22},"1.2～1.3",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},953183,"下列关于监理与相关服务收费的表述，错误的是( )。",[429,431,433,435],{"key":20,"text":430,"correct":22},"建设工程监理与相关服务的内容、质量要求和相应的收费金额以及支付方式，由发包人和监理人在监理与相关服务合同中约定",{"key":24,"text":432,"correct":22},"由于非监理人原因造成建设工程监理与相关服务工作量增加的，发包人应当按合同约定向监理人另行支付相应的建设工程监理与相关服务费",{"key":28,"text":434,"correct":26},"由于监理人原因造成监理与相关服务工作量增加的，监理人应按合同约定向发包人支付相应赔偿",{"key":31,"text":436,"correct":22},"监理人提出合理化建议经采用、取得实效的，发包人可另行给予奖励",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},953184,"监理单位在业主委托的工程范围内，拥有选择工程总设计单位和施工总承包单位的( )。",[441,443,445,447],{"key":20,"text":442,"correct":22},"确认权",{"key":24,"text":444,"correct":22},"否定权",{"key":28,"text":446,"correct":26},"建议权",{"key":31,"text":448,"correct":22},"签认权",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},953185,"建设工程监理与相关服务收费，应当体现( )的原则。",[453,455,457,459],{"key":20,"text":454,"correct":26},"优质优价",{"key":24,"text":456,"correct":22},"成本效益",{"key":28,"text":458,"correct":22},"适当性",{"key":31,"text":460,"correct":22},"依法审计",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},953186,"下列关于工程监理与政府质量监督区别的表述，错误的是( )。",[465,467,469,471],{"key":20,"text":466,"correct":22},"建设工程监理的实施单位是社会化、专业化的监理单位，政府工程质量监督的执行者是政府行政主管部门的专业执行机构",{"key":24,"text":468,"correct":22},"监理单位和被监理单位是平等主体之间的监督管理，政府质量监督是一种行政管理",{"key":28,"text":470,"correct":22},"建设工程监理是由建设项目业主委托进行的，政府工程质量监督则是依法进行并具有强制性的",{"key":31,"text":472,"correct":26},"建设工程监理工作范围一般只限于施工阶段，现行政府工程质量监督一般贯穿项目建设的全过程、全方位",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},953187,"为了保证工程项目建设的顺利实施，业主应依据( )对监理机构履行合同的行为给予监督和检查。",[477,479,481,483],{"key":20,"text":478,"correct":26},"监理合同",{"key":24,"text":480,"correct":22},"有关技术标准",{"key":28,"text":482,"correct":22},"工程承包合同",{"key":31,"text":484,"correct":22},"建设工程合同",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},953188,"监理单位发布的停、复工令应当事先向业主报告，如在紧急情况下未能事先报告时，则应在( )h内向业主作出局面报告。",[489,491,493,495],{"key":20,"text":490,"correct":22},"12",{"key":24,"text":492,"correct":26},"24",{"key":28,"text":494,"correct":22},"48",{"key":31,"text":496,"correct":22},"72",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},953189,"下列关于监理机构的表述，错误的是( )。",[501,503,505,507],{"key":20,"text":502,"correct":22},"在监理过程中如发现承建商工作不力，可提出调换有关人员的建议",{"key":24,"text":504,"correct":22},"当业主和第三方发生争议时，以独立的身份判断，公正地进行调解",{"key":28,"text":506,"correct":26},"可对任何第三方合同规定的义务提出变更且无需业主授权",{"key":31,"text":508,"correct":22},"在工程承包合同约定的工程价格范围内，对工程款支付拥有审核和签认权",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},953190,"承包单位报送的工程开工报审表及相关资料由( )审查。",[513,515,517,519],{"key":20,"text":514,"correct":22},"总监理工程师",{"key":24,"text":516,"correct":26},"专业监理工程师",{"key":28,"text":518,"correct":22},"总监理工程师代表",{"key":31,"text":520,"correct":22},"监理员",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},953191,"下列关于工程质量控制方法的表述，不正确的是( )。",[525,527,529,531],{"key":20,"text":526,"correct":26},"质量控制应以事后控制为主",{"key":24,"text":528,"correct":22},"对关键工序和重点部位施工过程进行旁站监理",{"key":28,"text":530,"correct":22},"严格执行现场见证取样和送检制度",{"key":31,"text":532,"correct":22},"应采用必要的检查，测量和试验手段，以验证施工质量",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},953192,"设计单位对原设计存在的缺陷提出的工程变更，应( )。",[537,539,541,543],{"key":20,"text":538,"correct":22},"提交总监理工程师",{"key":24,"text":540,"correct":22},"由总监理工程师组织专业监理工程师审查",{"key":28,"text":542,"correct":26},"编制设计变更文件",{"key":31,"text":544,"correct":22},"按规定报有关部门审定",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},953193,"建设项目工程监理，是指具有相应资质的监理单位，受( )的委托，依据国家有关法律、法规及有关的文件、合同，对工程实施的专业化监督管理。",[549,551,553,555],{"key":20,"text":550,"correct":22},"建设项目施工方",{"key":24,"text":552,"correct":22},"建设项目设计方",{"key":28,"text":554,"correct":26},"建设项目业主",{"key":31,"text":556,"correct":22},"建设项目业主与施工方",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":28,"analysis":33},953194,"总监理工程师应就工程变更费用及工期的评估情况与( )进行协调。",[561,562,563,565],{"key":20,"text":185,"correct":22},{"key":24,"text":187,"correct":22},{"key":28,"text":564,"correct":26},"承包单位和建设单位",{"key":31,"text":566,"correct":22},"建设单位和设计单位",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},953195,"建设工程项目施工监理由两个或者两个以上监理人承担，而发包人委托其中一个监理人对建设工程项目施工监理总负责的，该监理人应按照各监理人合计监理费的( )加收总体协调费。",[571,573,575,577],{"key":20,"text":572,"correct":22},"2%～3%",{"key":24,"text":574,"correct":26},"5%～7%",{"key":28,"text":576,"correct":22},"4%～6%",{"key":31,"text":578,"correct":22},"2%～5%",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},953196,"实行政府指导价的建设工程施工阶段监理收费，其基准价应根据《建设工程监理与相关服务收费标准》计算，浮动幅度为上下( )。",[583,585,586,587],{"key":20,"text":584,"correct":22},"10%",{"key":24,"text":299,"correct":22},{"key":28,"text":301,"correct":26},{"key":31,"text":588,"correct":22},"25%",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},953197,"下列不属于工程风险特征的是( )。",[593,595,597,599],{"key":20,"text":594,"correct":22},"风险损失的严重性",{"key":24,"text":596,"correct":26},"风险事件的突发性",{"key":28,"text":598,"correct":22},"风险因素的大量性",{"key":31,"text":600,"correct":22},"风险防范的多元性",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":20,"analysis":33},953198,"按国际惯例，工程担保可分为( )。",[605,607,609,611],{"key":20,"text":606,"correct":26},"承包商保证担保和建设单位责任保证担保",{"key":24,"text":608,"correct":22},"承包商责任保证担保和建设单位保证担保",{"key":28,"text":610,"correct":22},"承包商保证担保和设计单位责任保证担保",{"key":31,"text":612,"correct":22},"承包商责任保证担保和设计单位保证担保",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]