[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-690-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},690,"投资建设项目实施","建筑工程",0,2,50,433,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,282,294,306,318,330,342,354,365,377,389,401,413,425,437,449,461,473,485,497,509,519,531,543,555,567,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},953099,1,"单选题","采用分期付款方式采购设备，当采购方未支付到期价款达到全部价款的( )的，供应方可以要求采购方支付全部价款或者解除合同。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","1\u002F2",false,{"key":24,"text":25,"correct":22},"B","1\u002F3",{"key":27,"text":28,"correct":22},"C","1\u002F4",{"key":30,"text":31,"correct":32},"D","1\u002F5",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},953100,"合同中无相应计价项目的小型变更工程适用于的计价方式是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"按照成本加利润的原则商定或确定变更工作的单价",{"key":24,"text":41,"correct":22},"参照类似子目的单价确定变更价格",{"key":27,"text":43,"correct":32},"以计日工为依据定价",{"key":30,"text":45,"correct":22},"重新编制工程项目报价单",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},953101,"关于材料采购合同的违约责任的表述，错误的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"因供货方逾期交货，按合同约定依据逾期交货部分的货款总价计算违约金",{"key":24,"text":53,"correct":22},"在材料采购合同的履行中，如供货方交付的数量多于合同规定，采购方可在承付期内、拒付多交部分的贷款和运杂费",{"key":27,"text":55,"correct":32},"当交货数量与合同不符，采购方应立即通知供货方接收货物并处理",{"key":30,"text":57,"correct":22},"采购方逾期付款，应支付逾期付款利息，延期付款利率一般按每天万分之五计算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},953102,"当事人没有确切证据中止履行债务的，应当承担( )责任。",[62,64,66,68],{"key":20,"text":63,"correct":22},"连带责任",{"key":24,"text":65,"correct":32},"违约",{"key":27,"text":67,"correct":22},"主要责任",{"key":30,"text":69,"correct":22},"次要责任",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},953103,"关于合同变更与转让管理的表述，错误的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"当事人协商一致，可以变更合同",{"key":24,"text":77,"correct":22},"当事人对合同变更的内容约定不明确的，推定为未变更",{"key":27,"text":79,"correct":32},"债权人转让权利的，无需通知债务人",{"key":30,"text":81,"correct":22},"债务人将合同的义务部分转移给第三人的，应当经债权人同意",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},953104,"承包单位按约定接受了( )后，应被认为已无权再提出在合同工程接收证书颁发前所发生的任何索赔。",[86,88,90,92],{"key":20,"text":87,"correct":32},"竣工付款证书",{"key":24,"text":89,"correct":22},"最终结清证书",{"key":27,"text":91,"correct":22},"竣工验收合格证",{"key":30,"text":93,"correct":22},"缺陷责任期终止证书",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},953105,"建设项目管理最主要的依据和手段是( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"法律法规",{"key":24,"text":101,"correct":22},"从事管理的经验",{"key":27,"text":103,"correct":22},"建设项目管理制度",{"key":30,"text":105,"correct":32},"建设项目合同",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},953106,"建设单位和承包单位均可共同努力友好解决争议的方式是( )。",[110,112,114,116],{"key":20,"text":111,"correct":32},"协商",{"key":24,"text":113,"correct":22},"争议评审",{"key":27,"text":115,"correct":22},"仲裁",{"key":30,"text":117,"correct":22},"诉讼",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},953107,"合同履行期间，由于工程停建而终止合同或建设单位要求解除合同时，已进行勘察工作的，完成的工作量超过50%时，建设单位应向勘察人支付( )的勘察费。",[122,124,126,128],{"key":20,"text":123,"correct":22},"实际完成工作量",{"key":24,"text":125,"correct":22},"预算额50%",{"key":27,"text":127,"correct":22},"预算额80%",{"key":30,"text":129,"correct":32},"预算额100%",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},953108,"由于设计入自身原因，延误了按合同规定的设计资料及设计文件的交付时间，每延误一天，应减收该项目应收设计费的( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"千分之一",{"key":24,"text":137,"correct":32},"千分之二",{"key":27,"text":139,"correct":22},"千分之三",{"key":30,"text":141,"correct":22},"千分之四",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},953109,"下列项目中，实施见证取样检测的项目不包括( )。",[146,148,150,152],{"key":20,"text":147,"correct":32},"钢筋保护层厚度检测",{"key":24,"text":149,"correct":22},"水泥物理力学性能检验",{"key":27,"text":151,"correct":22},"混凝土、砂浆强度检验",{"key":30,"text":153,"correct":22},"沥青、沥青混合料检验",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},953110,"下列质量分析方法中，可以形象、直观地反映工程质量主次问题的是( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"控制图法",{"key":24,"text":161,"correct":22},"因果分析图",{"key":27,"text":163,"correct":32},"排列图法",{"key":30,"text":165,"correct":22},"直方图法",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},953111,"正常型直方图与质量标准相比较时，质量标准要求界限在实际质量特性分部范围中间，但两边余地太大，说明( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"已出现不合格品",{"key":24,"text":173,"correct":32},"加工过于精细，不经济",{"key":27,"text":175,"correct":22},"过程能力不足",{"key":30,"text":177,"correct":22},"产生了许多废品",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},953112,"已知 A、B工作的紧后工作为c、 D，其持续时间分别为3d、4d、2d、5d， A、B工作最早开始时间为第5d、第6d，则C工作最早开始时间为第( )d。",[182,184,186,188],{"key":20,"text":183,"correct":22},"4",{"key":24,"text":185,"correct":22},"6",{"key":27,"text":187,"correct":22},"8",{"key":30,"text":189,"correct":32},"10",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},953113,"审查和批准所有承包商、供货商按合同要求提交的各自的总进度计划及年、季、月实施进度计划是( )阶段的进度控制任务。",[194,196,198,200],{"key":20,"text":195,"correct":22},"工程设计",{"key":24,"text":197,"correct":22},"招标投标",{"key":27,"text":199,"correct":22},"实施准备",{"key":30,"text":201,"correct":32},"实施",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},953114,"下列进度计划中，( )一般适用于工期较长、较为复杂的大型建设项目。",[206,208,210,212],{"key":20,"text":207,"correct":32},"里程碑计划",{"key":24,"text":209,"correct":22},"横道图进度计划",{"key":27,"text":211,"correct":22},"网络进度计划",{"key":30,"text":213,"correct":22},"项目施工的月度施工计划",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},953115,"进度控制的组织措施不包括( )。",[218,220,222,224],{"key":20,"text":219,"correct":22},"健全组织体系",{"key":24,"text":221,"correct":32},"建设项目进度计划管理",{"key":27,"text":223,"correct":22},"设置专职部门",{"key":30,"text":225,"correct":22},"确定工作流程和相应的工作制度",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":30,"analysis":33},953116,"总时差是在不影响( )的前提下，本工作可以利用的机动时间。",[230,232,234,236],{"key":20,"text":231,"correct":22},"其紧后工作最早开始",{"key":24,"text":233,"correct":22},"总工期",{"key":27,"text":235,"correct":22},"其紧后工作最迟开始",{"key":30,"text":237,"correct":32},"其紧后工作最早完成",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},953117,"当缺少项目的工作详细信息时，可以采用( )估算工作的持续时间。",[242,244,246,248],{"key":20,"text":243,"correct":22},"定量计算法",{"key":24,"text":245,"correct":32},"单一时间估计法",{"key":27,"text":247,"correct":22},"经验估算法",{"key":30,"text":249,"correct":22},"三时估算法",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},953118,"当项目进度延误或某个里程碑进度不能按时实现的情况下，为了加快进度，通常的做法是( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"将关键工作变为非关键工作",{"key":24,"text":257,"correct":22},"改变关键线路上各工作之间的先后顺序",{"key":27,"text":259,"correct":32},"压缩关键线路上有关工作的持续时间",{"key":30,"text":261,"correct":22},"重新编制网络计划",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":30,"analysis":33},953119,"在工程网络计划中，工作w的最早开始时间为第28d，其持续时间为9d。该工作有三项紧后工作，它们的最迟开始时间分别为第40d、第43d和第48d，则工作w的总时差为( ) d。",[266,268,270,272],{"key":20,"text":267,"correct":22},"15",{"key":24,"text":269,"correct":22},"12",{"key":27,"text":271,"correct":22},"5",{"key":30,"text":273,"correct":32},"3",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":30,"analysis":33},953120,"对于非肯定型的网络计划，对应于计划评审技术(PERT)，当含有高度的不确定性工作项目时，可采用( )估算各项工作的持续时间。",[278,279,280,281],{"key":20,"text":243,"correct":22},{"key":24,"text":247,"correct":22},{"key":27,"text":245,"correct":22},{"key":30,"text":249,"correct":32},{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},953121,"下列设计进度测量方法中，( )适合于编写技术说明。",[286,288,290,292],{"key":20,"text":287,"correct":32},"完成单元法",{"key":24,"text":289,"correct":22},"渐进里程碑法",{"key":27,"text":291,"correct":22},"开始\u002F结束百分比法",{"key":30,"text":293,"correct":22},"比值法",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},953122,"建设工期是从开工建设时算起，到( )时停止。",[298,300,302,304],{"key":20,"text":299,"correct":22},"完工",{"key":24,"text":301,"correct":22},"完成承包工程全部设计内容",{"key":27,"text":303,"correct":32},"全部建成投产或交付使用",{"key":30,"text":305,"correct":22},"竣工验收合格",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},953123,"由于建设项目的管理过程具有( )的特点，进度计划系统的编制、管理和控制，既要沿用通用的管理原理，又要借鉴同类项目的进度计划管理和控制经验与技术成果，结合本项目实际创造性的进行管理。",[310,312,314,316],{"key":20,"text":311,"correct":32},"一次性",{"key":24,"text":313,"correct":22},"动态性",{"key":27,"text":315,"correct":22},"系统性",{"key":30,"text":317,"correct":22},"阶段性",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},953124,"关于关键工作和关键线路的表述，正确的是( )。",[322,324,326,328],{"key":20,"text":323,"correct":22},"网络计划中总时差为零的工作为关键工作",{"key":24,"text":325,"correct":32},"一个从始点到终点全部由关键工作所组成的线路为关键线路",{"key":27,"text":327,"correct":22},"一个从始点到终点全部由关键节点所组成的线路为关键线路",{"key":30,"text":329,"correct":22},"时差为最大值的节点串联起来的即为关键线路",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},953125,"为实现建设项目的总进度计划，编制与总进度计划相适应的各类资源需求和供应计划，属于进度控制的( )措施。",[334,336,338,340],{"key":20,"text":335,"correct":22},"组织",{"key":24,"text":337,"correct":22},"管理",{"key":27,"text":339,"correct":32},"经济",{"key":30,"text":341,"correct":22},"技术",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},953126,"在调整工作时间安排的时候，( )首先应该被利用。",[346,348,350,352],{"key":20,"text":347,"correct":32},"自由时差",{"key":24,"text":349,"correct":22},"总时差",{"key":27,"text":351,"correct":22},"持续时间",{"key":30,"text":353,"correct":22},"关键工作",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},953127,"一般有几个重叠的分项工作，每个分项工作有不同的工作计量单位的任务适合用( )测量。",[358,360,362,364],{"key":20,"text":359,"correct":22},"费用比率法",{"key":24,"text":361,"correct":32},"加权单元法",{"key":27,"text":363,"correct":22},"监督人员评价法",{"key":30,"text":289,"correct":22},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},953128,"对后续工作及工期影响的具体分析方法不包括( )。",[369,371,373,375],{"key":20,"text":370,"correct":32},"判断判断进度偏差是否影响关键工作",{"key":24,"text":372,"correct":22},"判断进度偏差是否在关键线路上",{"key":27,"text":374,"correct":22},"判断进度偏差是否大于总时差",{"key":30,"text":376,"correct":22},"判断进度偏差是否大于自由时差",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},953129,"建设项目的某项工作，在某时点的计划工作预算费用为1000万元，已完工作的预算费用为1500万元，已完工作实际费用为1800万元，则此时的进度偏差( )万元。",[381,383,385,387],{"key":20,"text":382,"correct":22},"-300",{"key":24,"text":384,"correct":22},"-500",{"key":27,"text":386,"correct":22},"300",{"key":30,"text":388,"correct":32},"500",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":27,"analysis":33},953130,"某下水管道项目进行赢值分析，原始项目估算为50050元，在某时点的已完工作的预算费用为7600元，已完工作实际费用为7700元，计划工作预算费用为7800元，根据对项目状况的分析，则项目总成本的新估算为( )元。",[393,395,397,399],{"key":20,"text":394,"correct":22},"43009",{"key":24,"text":396,"correct":22},"50609",{"key":27,"text":398,"correct":32},"50709",{"key":30,"text":400,"correct":22},"50809",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":27,"analysis":33},953131,"投标分析的重点是在投标文件( )检查的基础上，对商务报价进行逐项检查与分析。",[405,407,409,411],{"key":20,"text":406,"correct":22},"完整性",{"key":24,"text":408,"correct":22},"合理性",{"key":27,"text":410,"correct":32},"符合性",{"key":30,"text":412,"correct":22},"真实性",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},953132,"一般在竣工之前，业主提供的工程预付款和进度款总额不超过合同价的( )，其余尾款是工程竣工结算时支付的款额。",[417,419,421,423],{"key":20,"text":418,"correct":22},"70%",{"key":24,"text":420,"correct":22},"80%",{"key":27,"text":422,"correct":22},"90%",{"key":30,"text":424,"correct":32},"95%",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},953133,"措施项目费中的( )应当按照国家或省级、行业建设主管部门的规定标准计价。",[429,431,433,435],{"key":20,"text":430,"correct":22},"临时设施费",{"key":24,"text":432,"correct":22},"环境保护费",{"key":27,"text":434,"correct":32},"安全文明施工费",{"key":30,"text":436,"correct":22},"二次搬运费",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},953134,"招标人应根据招标文件中列出的内容和向总承包人提出的要求计算总承包费，其中，招标人自行供应材料的，按招标人供应材料价值的( )计算。",[441,443,445,447],{"key":20,"text":442,"correct":32},"1%",{"key":24,"text":444,"correct":22},"1.5%",{"key":27,"text":446,"correct":22},"2%",{"key":30,"text":448,"correct":22},"3%～5%",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},953135,"在( )合同中，招标人易于确定报价合理的中标人，且支付容易方便，但是只能用于工程量计算准确、工期较短的项目，否则投资控制要承担一定量的风险。",[453,455,457,459],{"key":20,"text":454,"correct":22},"固定单价",{"key":24,"text":456,"correct":32},"总价",{"key":27,"text":458,"correct":22},"可调单价",{"key":30,"text":460,"correct":22},"成本加酬金",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},953136,"因采用新技术、新设备、新工艺确能降低运行成本，又符合\"安全、可靠、经济、适用、符合国情\"的原则，而使工程投资增加，应在技术经济综合评价和必要的审查后，由( )确定。",[465,467,469,471],{"key":20,"text":466,"correct":32},"业主",{"key":24,"text":468,"correct":22},"承包商",{"key":27,"text":470,"correct":22},"设计单位",{"key":30,"text":472,"correct":22},"监理单位",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},953137,"编制资金使用计划过程中最重要的步骤是( )。",[477,479,481,483],{"key":20,"text":478,"correct":32},"项目投资目标的分解",{"key":24,"text":480,"correct":22},"分析产生偏差的原因",{"key":27,"text":482,"correct":22},"投资实际值与目标值的比较",{"key":30,"text":484,"correct":22},"找出实际支出额与投资控制目标值之间的偏差",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},953138,"一般在采购合同签订后，设备开始制造前，由买方向卖方提供合同总价的( )作为预付款。",[489,491,493,495],{"key":20,"text":490,"correct":22},"8%～15%",{"key":24,"text":492,"correct":32},"10%～20%",{"key":27,"text":494,"correct":22},"15%～25%",{"key":30,"text":496,"correct":22},"20%～30%",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},953139,"关于建设项目投资预算的表述，正确的是( )。",[501,503,505,507],{"key":20,"text":502,"correct":22},"年度、季度投资预算是编制总投资预算的依据",{"key":24,"text":504,"correct":32},"投资总预算是考核设计方案经济性的依据",{"key":27,"text":506,"correct":22},"年度投资预算是对建设项目投资支出进行评审、核准、筹资、支付和监控的主要依据",{"key":30,"text":508,"correct":22},"投资总预算是建设资金筹措和准备的依据",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},953140,"里程碑进度计价支付方式，一般在( )合同中使用，其关键是合同双方确定工程进度款支付的里程碑进度和每个里程碑进度的支付金额和比例。",[513,515,516,518],{"key":20,"text":514,"correct":22},"纯单价",{"key":24,"text":458,"correct":22},{"key":27,"text":517,"correct":32},"固定总价",{"key":30,"text":460,"correct":22},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":27,"analysis":33},953141,"专用设备价款的支付和结算，一般不包括( )。",[523,525,527,529],{"key":20,"text":524,"correct":22},"预付款",{"key":24,"text":526,"correct":22},"阶段付款",{"key":27,"text":528,"correct":32},"进度款",{"key":30,"text":530,"correct":22},"最终付款",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":20,"analysis":33},953142,"下列费用中，主要指设计变更及施工过程中可能增加工程量导致的费用是( )。",[535,537,539,541],{"key":20,"text":536,"correct":32},"基本预备费",{"key":24,"text":538,"correct":22},"涨价预备费",{"key":27,"text":540,"correct":22},"生产准备费",{"key":30,"text":542,"correct":22},"工程质量监督费",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},953143,"当年开工，当年不能竣工的新开工工程或单位工程，通常采用( )方式结算工程价款。",[547,549,551,553],{"key":20,"text":548,"correct":22},"按月结算",{"key":24,"text":550,"correct":32},"分段结算",{"key":27,"text":552,"correct":22},"里程碑进度结算方式",{"key":30,"text":554,"correct":22},"竣工后一次结算",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":30,"analysis":33},953144,"招标控制价是招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法，按设计施工图纸计算的，对招标工程限定的( )。",[559,561,563,565],{"key":20,"text":560,"correct":22},"最低报价",{"key":24,"text":562,"correct":22},"最高报价",{"key":27,"text":564,"correct":22},"最低工程造价",{"key":30,"text":566,"correct":32},"最高工程造价",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":27,"analysis":33},953145,"工程招标时，工程量难以确定的建设项目适用于( )合同形式。",[571,572,574,575],{"key":20,"text":517,"correct":22},{"key":24,"text":573,"correct":22},"可调总价",{"key":27,"text":454,"correct":32},{"key":30,"text":460,"correct":22},{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":30,"analysis":33},953146,"建设项目业主根据项目功能目标的调整提出的工程变更不包括( )。",[580,582,584,586],{"key":20,"text":581,"correct":22},"工程范围",{"key":24,"text":583,"correct":22},"建设内容的变更",{"key":27,"text":585,"correct":22},"工艺技术方案的变更",{"key":30,"text":587,"correct":32},"现场施工条件变化的变更",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":30,"analysis":33},953147,"竣工结算要有严格的审查，一般要考虑的方面不包括( )。",[592,594,596,598],{"key":20,"text":593,"correct":22},"核对合同条款",{"key":24,"text":595,"correct":22},"关键工序，关键部位检查记录",{"key":27,"text":597,"correct":22},"落实设计变更签证",{"key":30,"text":599,"correct":32},"按图核实工程数量",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":30,"analysis":33},953148,"下列关于施工单位职业健康安全责任的表述，错误的是( )。",[604,606,608,610],{"key":20,"text":605,"correct":22},"施工单位采购、租赁的安全防护用具、机械设备、施工机具及配件，应当具有生产许可证、产品合格证",{"key":24,"text":607,"correct":22},"施工单位应当在施工现场采取措施，防止或者减少粉尘、废气、废水、噪声、振动和施工照明对人和环境的危害和污染",{"key":27,"text":609,"correct":22},"建筑施工企业应当依法为职工参加工伤保险缴纳工伤保险费",{"key":30,"text":611,"correct":32},"分包单位应当服从总承包单位的安全生产管理，分包单位不服从管理导致生产安全事故的，由分包单位承担全部责任",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]