[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953472":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953472,690,2,"多选题","项目建设目标由总体目标和分项目标组成一个完整的目标体系，目标控制必须是( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","动态的",false,{"key":16,"text":17,"correct":14},"B","确定的",{"key":19,"text":20,"correct":21},"C","系统的",true,{"key":23,"text":24,"correct":21},"D","连续的",{"key":26,"text":27,"correct":14},"E","独立的","CD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]