[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953468":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953468,690,2,"多选题","在项目建设实施管理目标体系中，最重要的是( )控制目标。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","质量",true,{"key":16,"text":17,"correct":14},"B","工期",{"key":19,"text":20,"correct":14},"C","费用",{"key":22,"text":23,"correct":14},"D","安全生产",{"key":25,"text":26,"correct":27},"E","信息管理",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]