[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953464":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953464,690,2,"多选题","分析评价建设项目的目标实现程度是后评价的重要任务之一，评价时可从( )等方面进行分析。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","项目工程是否建成",true,{"key":16,"text":17,"correct":14},"B","项目技术是否建成",{"key":19,"text":20,"correct":21},"C","项目目标是否建成",false,{"key":23,"text":24,"correct":14},"D","项目经济是否建成",{"key":26,"text":27,"correct":14},"E","项目影响是否建成","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]