[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953460":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953460,690,2,"多选题","项目后评价需要依据的资料文件有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","政府部门或相关行业的后评价管理文件",true,{"key":16,"text":17,"correct":14},"B","项目前期文件",{"key":19,"text":20,"correct":14},"C","项目实施文件",{"key":22,"text":23,"correct":14},"D","项目自我总结评价报告",{"key":25,"text":26,"correct":27},"E","各种媒体发表的与建设项目有关的评论和文章",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]