[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953456":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953456,690,2,"多选题","项目建设全过程一般分为( )等阶段。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","立项决策",true,{"key":16,"text":17,"correct":14},"B","实施准备",{"key":19,"text":20,"correct":14},"C","建设实施",{"key":22,"text":23,"correct":14},"D","竣工投产",{"key":25,"text":26,"correct":27},"E","保修",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]