[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953455":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953455,690,2,"多选题","为使全面竣工验收工作顺利进行，项目业主事先应做好的准备工作有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","核实建安工程，抓紧工程收尾",true,{"key":16,"text":17,"correct":18},"B","筹组竣工验收委员会",false,{"key":20,"text":21,"correct":18},"C","提出正式验收申请报告",{"key":23,"text":24,"correct":14},"D","编制竣工决算，提出财务决算分析",{"key":26,"text":27,"correct":14},"E","复查工程质量，限定修复时间","ADE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]