[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953437":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953437,690,2,"多选题","建设项目内部控制的目标主要包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","提高投资效益，促进建设项目总体目标的实现",true,{"key":16,"text":17,"correct":14},"B","保证建设项目资产的安全、完整和有效使用",{"key":19,"text":20,"correct":14},"C","遵守国家的有关法律法规和建设单位内部的规章制度",{"key":22,"text":23,"correct":14},"D","保证财务会计及项目建设信息资料的真实、准确、及时、可靠",{"key":25,"text":26,"correct":27},"E","将建设项目工程总造价控制在审定的施工图总预算之内",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]