[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953435":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953435,690,2,"多选题","建设项目管理中必须分离的不相容职务，主要包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","授权审批职务与业务执行职务",true,{"key":16,"text":17,"correct":14},"B","业务经办职务与审核监督职务",{"key":19,"text":20,"correct":21},"C","业务经办职务与业务执行职务",false,{"key":23,"text":24,"correct":14},"D","业务经办职务与会计记录职务",{"key":26,"text":27,"correct":14},"E","业务经办职务与财产保管职务","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]