[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953432":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953432,690,2,"多选题","建设项目内部审计实施阶段的主要任务是( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","制定审计计划",false,{"key":16,"text":17,"correct":14},"B","审计工作作出合理安排",{"key":19,"text":20,"correct":21},"C","获取充分、相关、可靠的审计证据",true,{"key":23,"text":24,"correct":21},"D","完整、准确地记录审计程序的执行过程",{"key":26,"text":27,"correct":14},"E","提出审计结论和建议","CD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]