[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953423":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953423,690,2,"多选题","编制建设项目财务计划的主要依据包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","经批准的建设项目初步设计概算和施工图预算",true,{"key":16,"text":17,"correct":14},"B","项目建设进度计划",{"key":19,"text":20,"correct":14},"C","债务资金筹资方案",{"key":22,"text":23,"correct":24},"D","项目投资支出计划",false,{"key":26,"text":27,"correct":14},"E","建设项目投资各方的投资协议或合同","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]