[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953402":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953402,690,2,"多选题","工程复杂程度等级分为( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","简单",false,{"key":16,"text":17,"correct":18},"B","一般",true,{"key":20,"text":21,"correct":18},"C","复杂",{"key":23,"text":24,"correct":18},"D","较复杂",{"key":26,"text":27,"correct":14},"E","特别复杂","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]