[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953399":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953399,690,2,"多选题","下列关于施工阶段工程质量控制原则的表述，正确的是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","对建设项目工程施工全过程实施质量控制，并以事后控制为重点",false,{"key":16,"text":17,"correct":18},"B","严格要求承包单位执行有关材料试验制度和设备检验制度",true,{"key":20,"text":21,"correct":18},"C","对工程项目的人、机、料、方法、环境等因素进行全面的质量控制，监督承包单位的质量保证体系落实到位",{"key":23,"text":24,"correct":18},"D","以工程设计、施工及验收规范、工程质量验评标准等为依据，督促工程承包单位全面实现承包合同约定的质量目标",{"key":26,"text":27,"correct":18},"E","坚持不合格的建筑材料、构配件和设备不准在工程上使用","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]