[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953380":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953380,690,2,"多选题","与项目建设有关的工程建设其他费用有( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","建设管理费",true,{"key":16,"text":17,"correct":14},"B","可行性研究费",{"key":19,"text":20,"correct":14},"C","研究试验费",{"key":22,"text":23,"correct":24},"D","联合试运转费",false,{"key":26,"text":27,"correct":24},"E","生产准备费","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]