[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953357":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953357,690,2,"多选题","建设项目初步设计文件应当满足( )的需要。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设备材料采购",false,{"key":16,"text":17,"correct":18},"B","编制施工招标文件",true,{"key":20,"text":21,"correct":18},"C","主要设备材料订货",{"key":23,"text":24,"correct":14},"D","非标准设备制作",{"key":26,"text":27,"correct":18},"E","编制施工图设计文件","BCE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]