[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953337":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953337,690,2,"多选题","建设单位会同设计单位对勘察单位编制的勘查工作纲要予以审核，其审查内容包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","勘查工作纲要是否符合勘察合同规定",true,{"key":16,"text":17,"correct":14},"B","勘查工作纲要能否实现合同要求",{"key":19,"text":20,"correct":14},"C","勘查工作方案是否合理",{"key":22,"text":23,"correct":14},"D","勘查工作进度是否满足要求",{"key":25,"text":26,"correct":27},"E","勘察方案是否具有使用价值",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]