[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953329":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953329,690,2,"多选题","民用建筑工程建设项目，一般分为( )阶段。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","扩初设计",false,{"key":16,"text":17,"correct":14},"B","技术设计",{"key":19,"text":20,"correct":21},"C","方案设计",true,{"key":23,"text":24,"correct":21},"D","初步设计",{"key":26,"text":27,"correct":21},"E","施工图设计","CDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]