[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953325":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953325,690,2,"多选题","工程施工阶段的设计管理包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","设计交底",true,{"key":16,"text":17,"correct":14},"B","设计图会审",{"key":19,"text":20,"correct":14},"C","设计变更",{"key":22,"text":23,"correct":24},"D","设计方案审核",false,{"key":26,"text":27,"correct":14},"E","完工验收阶段设计报告","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目实施","建筑工程",0]