[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953321":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953321,690,1,"单选题","不管采用哪种工程设计管理方式，最终决策人和最终风险承担人都是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工总承包单位",false,{"key":16,"text":17,"correct":14},"B","设计单位",{"key":19,"text":20,"correct":14},"C","使用单位",{"key":22,"text":23,"correct":24},"D","建设单位",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]