[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953316":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},953316,690,1,"单选题","下列属于建设单位对施工阶段的管理工作的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主持召开第一次工地会议",false,{"key":16,"text":17,"correct":18},"B","建立管理工作月报制度，逐月检查进度计划完成情况",true,{"key":20,"text":21,"correct":14},"C","编制工程建设施工的总体进度计划和年度资金使用计划",{"key":23,"text":24,"correct":14},"D","审核重要工序、关键部位的施工技术方案","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]