[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953302":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953302,690,1,"单选题","建设单位应向项目主管部门和政府环境保护行政主管部门提交项目环境保护工程预验收申请报告，附试运转监测报告，由( )组织环保工程预验收。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","县级政府环境保护行政主管部门",false,{"key":16,"text":17,"correct":14},"B","市级政府环境保护行政主管部门",{"key":19,"text":20,"correct":21},"C","省级政府环境保护行政主管部门",true,{"key":23,"text":24,"correct":14},"D","国务院环境保护行政主管部门","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]