[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953292":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},953292,690,1,"单选题","下列选项中，( )是项目后评价的核心内容。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目目标实现程度和可持续性能力评价",false,{"key":16,"text":17,"correct":18},"B","项目绩效和影响评价",true,{"key":20,"text":21,"correct":14},"C","项目建设主要经验与教训",{"key":23,"text":24,"correct":14},"D","项目建设全过程的回顾与评价","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]