[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953291":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953291,690,1,"单选题","在项目成功度测评等级中，基本成功是指( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目原定目标部分实现，项目功能有缺陷，效益和影响只有部分实现",false,{"key":16,"text":17,"correct":14},"B","项目原定目标实现非常少，项目功能有问题，效益和影响很差",{"key":19,"text":20,"correct":21},"C","项目原定目标大部分实现，项目功能、效益和影响基本达到预期要求",true,{"key":23,"text":24,"correct":14},"D","项目原定目标全面实现或超过预期，项目功能、效益和影响充分发挥","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]