[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953288":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953288,690,1,"单选题","在项目后评价的实施过程中，签订委托合同，搜集项目资料后应当( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","明确项目经理，筹组后评价组",true,{"key":16,"text":17,"correct":18},"B","聘请相关专家，明确任务分工",false,{"key":20,"text":21,"correct":18},"C","制定工作计划，设计调查方案",{"key":23,"text":24,"correct":18},"D","开展现场调查，听取各方反映","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]