[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953274":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},953274,690,1,"单选题","在项目实施过程中，( )是一项十分重要的生产准备工作，是落实全部生产准备工作的基础。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","生产技术准备",false,{"key":16,"text":17,"correct":18},"B","生产人员准备",true,{"key":20,"text":21,"correct":14},"C","生产物资准备",{"key":23,"text":24,"correct":14},"D","外部协作条件准备","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]