[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953270":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953270,690,1,"单选题","项目生产准备的目的不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","使工程项目建成后能够及时完成试车调试",false,{"key":16,"text":17,"correct":14},"B","形成完整的生产能力",{"key":19,"text":20,"correct":21},"C","保证建设项目从生产运营阶段转入投产使用阶段",true,{"key":23,"text":24,"correct":14},"D","使投资发挥效益","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]