[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953263":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953263,690,1,"单选题","竣工验收审计应采用( )，设计图与竣工图循环审查法，通过分析两者的差异来分析评价相关变更、签证的真实性与合法性。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","观察询问法",false,{"key":16,"text":17,"correct":14},"B","分析复核法",{"key":19,"text":20,"correct":14},"C","假设问题求证法",{"key":22,"text":23,"correct":24},"D","现场检查法",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]