[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953248":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953248,690,1,"单选题","建设项目管理负责人，在现实条件下为实现建设项目财务预定目标，在拟定多种可行性方案的基础上，择优选择最合理有效的行动方案的过程称为( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","财务控制",false,{"key":16,"text":17,"correct":14},"B","财务分析",{"key":19,"text":20,"correct":14},"C","财务预测",{"key":22,"text":23,"correct":24},"D","财务决策",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]