[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953233":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953233,690,1,"单选题","对于( )的工程，发包方对工程质量有异议的，其质量争议按工程保修合同执行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竣工未验收但已实际投入使用",true,{"key":16,"text":17,"correct":18},"B","停工、停建",false,{"key":20,"text":21,"correct":18},"C","已竣工验收未实际投入使用",{"key":23,"text":24,"correct":18},"D","未竣工验收","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]